Getting it into your agent
One page per mod, every tool's command on it. A separate URL per tool would split the same page into five that compete with each other.
npx agentmods add skills/nipunfaircode/faircode-frappe/faircode-risk-registernpx skills add nipunFaircode/faircode-frappe --skill faircode-risk-registergit clone --depth 1 https://github.com/nipunFaircode/faircode-frappeWhat it costs to keep this loaded
Counted locally with the o200k_base tokenizer, which is exact for GPT models; Claude uses its own tokenizer and its counts differ. Treat this as one consistent yardstick across the catalogue rather than a bill. Prices are per million input tokens.
| Model | Per session | Once invoked |
|---|---|---|
| Fable 5 | $0.00064 | $0.00849 |
| Opus 5 | $0.00032 | $0.00425 |
| Sonnet 5 | $0.00013 | $0.00170 |
| Haiku 4.5 | $0.00006 | $0.00085 |
Grade A, and why
faircode-risk-register scanned grade A with 0 findings against 26 rules in 11 categories — prompt injection, anti-refusal, data exfiltration, privilege escalation, supply chain, agent snooping, system-prompt leakage, SSRF and excessive agency — measured 2d ago.
A static scan of the body, not an audit. Every finding is printed with the line that produced it so you can judge whether it matters here. A mod is markdown that instructs an agent; that is exactly why what it instructs is worth reading.
Nothing flagged
None of the 26 patterns this scan looks for appear in this file: no shell pipes, no recursive deletes, no credential paths, no hidden text, no instruction-override or anti-refusal phrasing, no agent-config snooping. That is not a guarantee, it is the absence of the things that are checkable.
The source is not reproduced here
No licence file
A repository with no LICENSE is all rights reserved by default, so the body is not copied here. The metadata, the measurements and the link are.
What this file has done since we first saw it
Hashed on every crawl. A supply-chain change to an agent config is a question of when, not whether, so the history is kept rather than the latest state alone.
- 2d ago First seen · 92 lines · 64 tokens per session scan A 493dcf81181c
faircode-risk-register is a skill published in the GitHub repository nipunFaircode/faircode-frappe (2 stars, last pushed 2mo ago), with no licence file. It adds 64 tokens to every session and 849 once invoked, about $0.0003 per session on Opus 5. A static security scan graded it A with 0 findings. No closer match exists in the catalogue, so it is treated as the original; first seen 2026-08-31.
Other skills, from other repositories
paperclip
Interact with the Paperclip control plane API for task coordination and governance. Use when checking assignments, updating issue status, posting comments, delegating work, managing routines, or calling Paperclip API endpoints.
wayfinder
Plan a huge chunk of work (more than one agent session can hold) as a shared map of decision tickets on your issue tracker, and resolve them one at a time until the way to the destination is clear.
github-labels-query
List GitHub repository labels with perpage pagination and name filtering support.
gsd-audit-milestone
Audit milestone completion against original intent before archiving.
spec-kitty-charter-doctrine
Run charter interview, generation, context, and sync workflows for project governance in Spec Kitty 3.x. Access doctrine artifacts programmatically via DoctrineService. Resolve agent profiles. Load action-scoped governance context iteratively, not all at once. Triggers: "interview for charter", "generate charter"…
bug-triage
Read all open bugs in production/qa/bugs/, re-evaluate priority vs. severity, assign to sprints, surface systemic trends, and produce a triage report. Run at sprint start or when the bug count grows enough to need re-prioritization.