Agent
Independent critique of a design (PRD + TDD set + accepted ADRs) BEFORE the design PR is opened. Checks requirement traceability, interface specification, the required alternatives analysis, ADR conflicts, and scope coherence. Use at /tdd-author close-out.
2 16d ago A 57 tokens
original MIT