Getting it into your agent
One page per mod, every tool's command on it. A separate URL per tool would split the same page into five that compete with each other.
git clone --depth 1 https://github.com/Avinava/document-design-systemWrote this? Show the measurements
A badge with what this costs and how it scanned, read live from this page, so it follows the numbers instead of freezing them. Markdown for a README, HTML for a documentation site or a project page.
[](https://agentmods.dev/commands/avinava/document-design-system/risk-register)<a href="https://agentmods.dev/commands/avinava/document-design-system/risk-register"><img src="https://agentmods.dev/badge/commands/avinava/document-design-system/risk-register/github.svg" alt="Measured on agentmods" height="20"></a>Or the 80×15 button, for a site that already has a row of RSS and ATOM ones. Only the verdict fits; the numbers stay here.
<a href="https://agentmods.dev/commands/avinava/document-design-system/risk-register"><img src="https://agentmods.dev/badge/commands/avinava/document-design-system/risk-register.svg" alt="Reviewed on agentmods" width="80" height="20"></a>What it costs to keep this loaded
Counted locally with the o200k_base tokenizer, which is exact for GPT models; Claude uses its own tokenizer and its counts differ. Treat this as one consistent yardstick across the catalogue rather than a bill. Prices are per million input tokens.
| Model | Per session | Once invoked |
|---|---|---|
| Fable 5.1 | $0.00022 | $0.00101 |
| Opus 5.5 | $0.00009 | $0.00040 |
| Sonnet 5.5 | $0.00004 | $0.00020 |
| Haiku 4.5 | $0.00002 | $0.00010 |
Grade A, and why
risk-register scanned grade A with 0 findings against 26 rules in 11 categories — prompt injection, anti-refusal, data exfiltration, privilege escalation, supply chain, agent snooping, system-prompt leakage, SSRF and excessive agency — measured 26d ago.
A static scan of the body, not an audit. Every finding is printed with the line that produced it so you can judge whether it matters here. A mod is markdown that instructs an agent; that is exactly why what it instructs is worth reading.
Nothing flagged
None of the 26 patterns this scan looks for appear in this file: no shell pipes, no recursive deletes, no credential paths, no hidden text, no instruction-override or anti-refusal phrasing, no agent-config snooping. That is not a guarantee, it is the absence of the things that are checkable.
What it actually says
Use the writing-documents skill.
Type slug: risk-register
Load references/type-risk-register.md, references/writing.md, and
references/evidence.md.
Default output is Markdown at the type's conventional path.
Load references/output.md and core/ only for requested HTML, PDF, print,
designed, or themed output.
What this file has done since we first saw it
Hashed on every crawl. A supply-chain change to an agent config is a question of when, not whether, so the history is kept rather than the latest state alone.
- 26d ago First seen · 12 lines · 22 tokens per session scan A f8c0e74345d6
risk-register is a command published in the GitHub repository Avinava/document-design-system (2 stars, last pushed 10d ago), licensed MIT. It adds 22 tokens to every session and 101 once invoked, about $0.0001 per session on Opus 5.5. A static security scan graded it A with 0 findings. No closer match exists in the catalogue, so it is treated as the original; first seen 2026-09-21.
Other commands, from other repositories
ash-workflow-setup
A setup wizard for checking and configuring the tools and permissions needed by the Feishu product-requirement workflow. Feishu is a collaboration and document platform.
ars-mark-read
ARS /ars-mark-read — record human-read signal for one or more citation keys.
ars-format-convert
ARS academic-paper format-convert mode — convert to LaTeX / DOCX / PDF / Markdown.
spreadsheet-audit
Perform a 6-step audit of an Excel spreadsheet for formula correctness, formatting consistency, data integrity, boss-auditable simplicity, and spec compliance. Uses the excel-screenshot MCP server tools — no Excel installation required.
wiki-tune
Tune wiki schema and conventions interactively.
pr
Take the current branch from uncommitted work to an open pull request: commit outstanding changes with the git-commit rules if asked, push with upstream tracking, write the PR title and body with the pr-description skill from the full branch diff, link the issue, and open it with gh against the right base. Confirms…