Getting it into your agent
One page per mod, every tool's command on it. A separate URL per tool would split the same page into five that compete with each other.
npx agentmods add skills/a3rdlab/llm-dev-demo/xlsxnpx skills add A3RDLab/LLM-dev-demo --skill xlsxgit clone --depth 1 https://github.com/A3RDLab/LLM-dev-demoWrote this? Show the measurements
A badge with what this costs and how it scanned, read live from this page, so it follows the numbers instead of freezing them. Markdown for a README, HTML for a documentation site or a project page.
[](https://agentmods.dev/skills/a3rdlab/llm-dev-demo/xlsx)<a href="https://agentmods.dev/skills/a3rdlab/llm-dev-demo/xlsx"><img src="https://agentmods.dev/badge/skills/a3rdlab/llm-dev-demo/xlsx.svg" alt="Measured on agentmods" height="20"></a>What it costs to keep this loaded
Counted locally with the o200k_base tokenizer, which is exact for GPT models; Claude uses its own tokenizer and its counts differ. Treat this as one consistent yardstick across the catalogue rather than a bill. Prices are per million input tokens.
| Model | Per session | Once invoked |
|---|---|---|
| Fable 5 | $0.00206 | $0.02137 |
| Opus 5 | $0.00103 | $0.01069 |
| Sonnet 5 | $0.00041 | $0.00427 |
| Haiku 4.5 | $0.00021 | $0.00214 |
Grade A, and why
xlsx scanned grade A with 0 findings against 26 rules in 11 categories — prompt injection, anti-refusal, data exfiltration, privilege escalation, supply chain, agent snooping, system-prompt leakage, SSRF and excessive agency — measured 5d ago.
A static scan of the body, not an audit. Every finding is printed with the line that produced it so you can judge whether it matters here. A mod is markdown that instructs an agent; that is exactly why what it instructs is worth reading.
Nothing flagged
None of the 26 patterns this scan looks for appear in this file: no shell pipes, no recursive deletes, no credential paths, no hidden text, no instruction-override or anti-refusal phrasing, no agent-config snooping. That is not a guarantee, it is the absence of the things that are checkable.
This is a copy
84% identical to xlsx — 15 lines differ, which has more behind it and is treated as the original. This page carries a canonical link to it rather than competing with it.
How it starts
The opening of the file, as written. The whole thing — 100 lines — stays where its author put it; the contents beside it link to each section on GitHub.
XLSX creation, editing, and analysis
| Task | Approach |
|---|---|
| Create or edit with formulas/formatting | openpyxl — see gotchas below |
| Bulk data in or out | pandas (read_excel, to_excel) |
| Quick look at a sheet | markitdown file.xlsx — ## SheetName per sheet; reads .xlsm too. No cell coordinates, so don't plan edits from it |
| Read a model (formulas and values) | two load_workbook passes — see gotchas |
openpyxl,pandas, andmarkitdownare preinstalled — do not runpip installfirst; write the script and import directly. Only if an import fails (or themarkitdowncommand is missing):pip installthe missing package.
Script paths below are relative to this skill's directory.
Requirements for every output
- Professional font (Arial, Times New Roman) throughout, unless the user says otherwise.
- Zero formula errors. Never ship while
recalc.pyreportserrors_found. If you think an error predates you, prove it: load the original withdata_only=Trueand look at that cell. An error you introduced looks exactly like one you inherited. - Use formulas, never hardcoded results. Write
sheet['B10'] = '=SUM(B2:B9)', not the Python-computed total. The sheet must recalculate when its inputs change. - Follow the user's spec literally. Exact tab names, exact column headers, and the formula they spelled out. A redesign that computes something else fails, however elegant.
- Document every assumption and hardcoded number where the reader will see it — a cell comment, or an adjacent cell at a table's end. Cite a real source when one exists (
Source: Company 10-K, FY2024, Page 45, Revenue Note, [SEC EDGAR URL]); when the number came from the user, say so plainly. - A workbook you create for someone to fill in needs a short legend naming which cells to edit, and one example row of realistic values showing the expected format. Never add such a row to a file you were asked to edit.
- Editing an existing file: match its conventions exactly. They override every guideline here. Find its designated input cells first — a distinct font color, fill, or shading marks them — write only there, and leave every existing formula untouched.
What ships with it
52 files beside SKILL.md in the same directory: the scripts, references and assets a skill reads on demand. Not counted in the per-session cost; read them before you install if any of them is executable.
- LICENSE.txt 1.4 KB
- scripts/office/helpers/__init__.py 3.3 KB runs code
- scripts/office/helpers/pptx_chart.py 5.7 KB runs code
- scripts/office/helpers/pptx_slide.py 1.6 KB runs code
- scripts/office/helpers/pptx_theme.py 3.4 KB runs code
- scripts/office/schemas/ecma/fouth-edition/opc-contentTypes.xsd 1.9 KB
- scripts/office/schemas/ecma/fouth-edition/opc-coreProperties.xsd 2.5 KB
- scripts/office/schemas/ecma/fouth-edition/opc-digSig.xsd 2.8 KB
- scripts/office/schemas/ecma/fouth-edition/opc-relationships.xsd 1.3 KB
- scripts/office/schemas/ISO-IEC29500-4_2016/dml-chart.xsd 73 KB
- scripts/office/schemas/ISO-IEC29500-4_2016/dml-chartDrawing.xsd 6.8 KB
- scripts/office/schemas/ISO-IEC29500-4_2016/dml-diagram.xsd 50 KB
- scripts/office/schemas/ISO-IEC29500-4_2016/dml-lockedCanvas.xsd 624 B
- scripts/office/schemas/ISO-IEC29500-4_2016/dml-main.xsd 148 KB
- scripts/office/schemas/ISO-IEC29500-4_2016/dml-picture.xsd 1.2 KB
- scripts/office/schemas/ISO-IEC29500-4_2016/dml-spreadsheetDrawing.xsd 8.7 KB
- scripts/office/schemas/ISO-IEC29500-4_2016/dml-wordprocessingDrawing.xsd 14 KB
- scripts/office/schemas/ISO-IEC29500-4_2016/pml.xsd 82 KB
- scripts/office/schemas/ISO-IEC29500-4_2016/shared-additionalCharacteristics.xsd 1.2 KB
- scripts/office/schemas/ISO-IEC29500-4_2016/shared-bibliography.xsd 7.2 KB
- scripts/office/schemas/ISO-IEC29500-4_2016/shared-commonSimpleTypes.xsd 6.2 KB
- scripts/office/schemas/ISO-IEC29500-4_2016/shared-customXmlDataProperties.xsd 1.2 KB
- scripts/office/schemas/ISO-IEC29500-4_2016/shared-customXmlSchemaProperties.xsd 880 B
- scripts/office/schemas/ISO-IEC29500-4_2016/shared-documentPropertiesCustom.xsd 2.5 KB
- scripts/office/schemas/ISO-IEC29500-4_2016/shared-documentPropertiesExtended.xsd 3.4 KB
- scripts/office/schemas/ISO-IEC29500-4_2016/shared-documentPropertiesVariantTypes.xsd 7.3 KB
- scripts/office/schemas/ISO-IEC29500-4_2016/shared-math.xsd 23 KB
- scripts/office/schemas/ISO-IEC29500-4_2016/shared-relationshipReference.xsd 1.3 KB
- scripts/office/schemas/ISO-IEC29500-4_2016/sml.xsd 237 KB
- scripts/office/schemas/ISO-IEC29500-4_2016/vml-main.xsd 26 KB
- scripts/office/schemas/ISO-IEC29500-4_2016/vml-officeDrawing.xsd 25 KB
- scripts/office/schemas/ISO-IEC29500-4_2016/vml-presentationDrawing.xsd 535 B
- scripts/office/schemas/ISO-IEC29500-4_2016/vml-spreadsheetDrawing.xsd 5.6 KB
- scripts/office/schemas/ISO-IEC29500-4_2016/vml-wordprocessingDrawing.xsd 3.9 KB
- scripts/office/schemas/ISO-IEC29500-4_2016/wml.xsd 167 KB
- scripts/office/schemas/ISO-IEC29500-4_2016/xml.xsd 4.5 KB
- scripts/office/schemas/mce/mc.xsd 3.1 KB
- scripts/office/schemas/microsoft/wml-2010.xsd 26 KB
- scripts/office/schemas/microsoft/wml-2012.xsd 3.7 KB
- scripts/office/schemas/microsoft/wml-2018.xsd 901 B
- scripts/office/schemas/microsoft/wml-cex-2018.xsd 1.7 KB
- scripts/office/schemas/microsoft/wml-cid-2016.xsd 1002 B
- scripts/office/schemas/microsoft/wml-sdtdatahash-2020.xsd 600 B
- scripts/office/schemas/microsoft/wml-symex-2015.xsd 745 B
- scripts/office/soffice.py 5.8 KB runs code
- scripts/office/validate.py 6.0 KB runs code
- scripts/office/validators/__init__.py 336 B runs code
- scripts/office/validators/base.py 33 KB runs code
- scripts/office/validators/docx.py 17 KB runs code
- scripts/office/validators/pptx.py 16 KB runs code
- scripts/office/validators/redlining.py 11 KB runs code
- scripts/recalc.py 10 KB runs code
What this file has done since we first saw it
Hashed on every crawl. A supply-chain change to an agent config is a question of when, not whether, so the history is kept rather than the latest state alone.
- 5d ago First seen · 100 lines · 206 tokens per session scan A 6712b39718fe
xlsx is a skill published in the GitHub repository A3RDLab/LLM-dev-demo (44 stars, last pushed 12d ago), licensed Apache-2.0. It adds 206 tokens to every session and 2,137 once invoked, about $0.0010 per session on Opus 5. A static security scan graded it A with 0 findings. It is 84% identical to xlsx, differing in 15 lines, and is treated as a copy.
Other skills, from other repositories
dcf-model
Build discounted cash flow valuation workbooks in Excel.
comps-analysis
Build comparable-company valuation workbooks in Excel.
lbo-model
Build leveraged buyout workbooks with IRR/MOIC in Excel.
google-workspace
Gmail, Calendar, Drive, Docs, Sheets via gws CLI or Python.
xlsx
Create, read, edit Excel .xlsx workbooks and CSVs.
excel-author
Build auditable financial workbooks headless via openpyxl.