work-breakdown

A planning guide for turning features and requirements into specific development tasks with clear boundaries and acceptance checks. Acceptance criteria are the conditions that show a task is complete.

In plain words
What is it for?
Use it to plan features, organize implementation work, and create actionable task lists.
Why use it?
It helps make complex work easier to implement and review by splitting it into concrete pieces.

Skill for Claude CodeCodex

Install

Getting it into your agent

One page per mod, every tool's command on it. A separate URL per tool would split the same page into five that compete with each other.

agentmods
npx agentmods add skills/bitwarden/ai-plugins/work-breakdown
Any agent
npx skills add bitwarden/ai-plugins --skill work-breakdown
Clone the repo
git clone --depth 1 https://github.com/bitwarden/ai-plugins

Made for: Claude Code, Codex.

Per session 0 Skills are progressive disclosure: only the name and description are preloaded; the body loads when the skill is used.
When invoked 1,299 The whole file, excluding the scripts and references it only reads on demand.
Security scan A 0 findings. Scan, not verified.
Origin unknown No closer match found in the catalogue.
Token cost

What it costs to keep this loaded

Counted locally with the o200k_base tokenizer, which is exact for GPT models; Claude uses its own tokenizer and its counts differ. Treat this as one consistent yardstick across the catalogue rather than a bill. Prices are per million input tokens.

ModelPer sessionOnce invoked
Fable 5 $0.00000 $0.01299
Opus 5 $0.00000 $0.00649
Sonnet 5 $0.00000 $0.00260
Haiku 4.5 $0.00000 $0.00130

Measured 2d ago against content hash 55f70286f208, method: parsed. Prices are Anthropic first-party input rates as of 2026-08-30, from the pricing page.

Security

Grade A, and why

work-breakdown scanned grade A with 0 findings against 26 rules in 11 categories — prompt injection, anti-refusal, data exfiltration, privilege escalation, supply chain, agent snooping, system-prompt leakage, SSRF and excessive agency — measured 2d ago.

A static scan of the body, not an audit. Every finding is printed with the line that produced it so you can judge whether it matters here. A mod is markdown that instructs an agent; that is exactly why what it instructs is worth reading.

Nothing flagged

None of the 26 patterns this scan looks for appear in this file: no shell pipes, no recursive deletes, no credential paths, no hidden text, no instruction-override or anti-refusal phrasing, no agent-config snooping. That is not a guarantee, it is the absence of the things that are checkable.

plugins/bitwarden-product-analyst/skills/work-breakdown/SKILL.md · 185 lines

The source is not reproduced here

No licence file

A repository with no LICENSE is all rights reserved by default, so the body is not copied here. The metadata, the measurements and the link are.

Read it on GitHub

Files

What ships with it

1 file beside SKILL.md in the same directory: the scripts, references and assets a skill reads on demand. Not counted in the per-session cost; read them before you install if any of them is executable.

Changes

What this file has done since we first saw it

Hashed on every crawl. A supply-chain change to an agent config is a question of when, not whether, so the history is kept rather than the latest state alone.

  1. 2d ago First seen · 185 lines · 0 tokens per session scan A 55f70286f208

Subscribe to this mod's changes

work-breakdown is a skill published in the GitHub repository bitwarden/ai-plugins (140 stars, last pushed 4d ago), with no licence file. It costs nothing until one of its globs matches a file; then it loads 1,299 tokens. A static security scan graded it A with 0 findings. No closer match exists in the catalogue, so it is treated as the original; first seen 2026-08-30.

Related

Other skills, from other repositories

systematic-debugging

Use when encountering any bug, test failure, or unexpected behavior, before proposing fixes.

obra/superpowers · 21 tokens

brainstorming

You MUST use this before any creative work - creating features, building components, adding functionality, or modifying behavior. Explores user intent, requirements and design before implementation.

obra/superpowers · 37 tokens

chat-pet-sprite-creation

Use when creating or changing VS Code chat pet sprite art, sprite sheets, state animations, eye treatments, Stable/Insiders variants, or pet transitions under src/vs/workbench/contrib/chat/browser/widget/media/chatPet.

microsoft/vscode · 53 tokens

cpu-profile-analysis

Analyze V8/Chrome CPU profiles (.cpuprofile) and DevTools trace files (Trace-.json). Use when: profiling performance, investigating slow functions, comparing code paths, finding bottlenecks, analyzing timeToRequest, understanding call trees from sampling profiler data, analyzing layout/paint/rendering, investigating…

microsoft/vscode · 71 tokens

agent-host-chat-contributions

Build and review cross-cutting agent-host chat behavior through lifecycle contributions. Use when adding turn lifecycle side effects, prompt or context injection, restored-history transformation, protocol-action observation, or when reviewing changes that add code to AgentSideEffects or AgentService.

microsoft/vscode · 56 tokens

auto-perf-optimize

Run agent-driven VS Code performance or memory investigations. Use when asked to launch Code OSS, automate a VS Code scenario, run the Chat memory smoke runner, capture renderer heap snapshots, take workflow screenshots, compare run summaries, or drive a repeatable scenario before heap-snapshot analysis.

microsoft/vscode · 62 tokens