e2e-critical-path

e2e-critical-path is a skill for Claude Code, Codex from blunotech-dev/agents. It costs 44 tokens per session (1,959 once invoked), scanned A, original, no licence file.

A guide for choosing and writing end-to-end tests for the three to five user journeys that matter most to revenue or keeping users. End-to-end tests check a complete flow through the application as a user would experience it.

In plain words
What is it for?
Use it to select critical flows such as checkout, signup, or renewal and turn them into end-to-end smoke tests.
Why use it?
It helps teams decide what to test first instead of spreading effort across less important paths. It also creates a focused set of smoke tests for catching serious breakages quickly.

Skill for Claude CodeCodex

Which agent this was written for is unclear — body not stored (licence); the path alone says nothing.

Good fit Use it to select critical flows such as checkout, signup, or renewal and turn them into end-to-end smoke tests.

Compare 6 skills from other repositories ↓
Install with agentmods
npx agentmods add skills/blunotech-dev/agents/e2e-critical-path
Install

Getting it into your agent

One page per mod, every tool's command on it. A separate URL per tool would split the same page into five that compete with each other.

Any agent
npx skills add blunotech-dev/agents --skill e2e-critical-path
Clone the repo
git clone --depth 1 https://github.com/blunotech-dev/agents

Made for: Claude Code, Codex.

Wrote this? Show the measurements

A badge with what this costs and how it scanned, read live from this page, so it follows the numbers instead of freezing them. Markdown for a README, HTML for a documentation site or a project page.

agentmods badge for e2e-critical-path

README.md
[![agentmods](https://agentmods.dev/badge/skills/blunotech-dev/agents/e2e-critical-path/github.svg)](https://agentmods.dev/skills/blunotech-dev/agents/e2e-critical-path)
Your own site
<a href="https://agentmods.dev/skills/blunotech-dev/agents/e2e-critical-path"><img src="https://agentmods.dev/badge/skills/blunotech-dev/agents/e2e-critical-path/github.svg" alt="Measured on agentmods" height="20"></a>

Or the 80×15 button, for a site that already has a row of RSS and ATOM ones. Only the verdict fits; the numbers stay here.

agentmods 80×15 button for e2e-critical-path

Your own site · 80×15
<a href="https://agentmods.dev/skills/blunotech-dev/agents/e2e-critical-path"><img src="https://agentmods.dev/badge/skills/blunotech-dev/agents/e2e-critical-path.svg" alt="Reviewed on agentmods" width="80" height="20"></a>
Per session 44 Skills are progressive disclosure: only the name and description are preloaded; the body loads when the skill is used.
When invoked 1,959 The whole file, excluding the scripts and references it only reads on demand.
Security scan A 1 finding. A grade says what 26 rules found in the file — not that it is safe.
Origin unknown No closer match found in the catalogue.
Token cost

What it costs to keep this loaded

Counted locally with the o200k_base tokenizer, which is exact for GPT models; Claude uses its own tokenizer and its counts differ. Treat this as one consistent yardstick across the catalogue rather than a bill. Prices are per million input tokens.

ModelPer sessionOnce invoked
Fable 5.1 $0.00044 $0.01959
Opus 5.5 $0.00018 $0.00784
Sonnet 5.5 $0.00009 $0.00392
Haiku 4.5 $0.00004 $0.00196

Measured 1mo ago against content hash 13d75fa052af, method: parsed. Prices are Anthropic first-party input rates as of 2026-10-07, from the pricing page.

Security

Grade A, and why

e2e-critical-path scanned grade A with 1 finding against 26 rules in 11 categories — prompt injection, anti-refusal, data exfiltration, privilege escalation, supply chain, agent snooping, system-prompt leakage, SSRF and excessive agency — measured 1mo ago.

A static scan of the body, not an audit. Every finding is printed with the line that produced it so you can judge whether it matters here. A mod is markdown that instructs an agent; that is exactly why what it instructs is worth reading.

Makes network callslowCapability

Not a fault in itself. Listed so you know the mod talks to something, and to what.

const res = await fetch(uploadedFileUrl);
testing/e2e-critical-path/SKILL.md · 223 lines

The source is not reproduced here

No licence file

A repository with no LICENSE is all rights reserved by default, so the body is not copied here. The metadata, the measurements and the link are.

Read it on GitHub

Changes

What this file has done since we first saw it

Hashed on every crawl. A supply-chain change to an agent config is a question of when, not whether, so the history is kept rather than the latest state alone.

  1. 1mo ago First seen · 223 lines · 44 tokens per session scan A 13d75fa052af

Subscribe to this mod's changes

e2e-critical-path is a skill published in the GitHub repository blunotech-dev/agents (2 stars, last pushed 5mo ago), with no licence file. It adds 44 tokens to every session and 1,959 once invoked, about $0.0002 per session on Opus 5.5. A static security scan graded it A with 1 finding (makes network calls). No closer match exists in the catalogue, so it is treated as the original; first seen 2026-09-03.

Related

Other skills, from other repositories

verify-omnigent

Drive Omnigent the way a user does and prove a behavior with recorded evidence, using an isolated server, runner, and mock model plus a feature map of every user entry point. Load before reproducing a user-facing bug, before claiming a fix works, or when reviewing whether a change covered every surface (session vs.…

omnigent-ai/omnigent · 100 tokens

test-master

Generates test files, creates mocking strategies, analyzes code coverage, designs test architectures, and produces test plans and defect reports across functional, performance, and security testing disciplines. Use when writing unit tests, integration tests, or E2E tests; creating test strategies or automation…

Jeffallan/claude-skills · 104 tokens

eval-dataset-design

A guide to creating reliable test sets for AI agents. Each evaluation task includes the request, the simulated user's behaviour, a reset starting state, and a success check that can be independently verified.

bojieli/ai-agent-book · 138 tokens

dogfood

Systematically explore and test a mobile app on iOS/Android with agent-device to find bugs, UX issues, and other problems. Use when asked to dogfood, QA, exploratory test, find issues, bug hunt, or test this app on mobile.

callstack/agent-device · 55 tokens

cua-driver

Use Cua Driver for desktop or browser tasks that are awkward or unavailable through Bash/APIs, or when the user explicitly wants GUI interaction: app testing, visual bug reproduction, form filling, calendar entry, screenshots, and demo recording. Also covers Cua setup; not OpenAI Codex Computer Use or web research.

davidondrej/skills · 68 tokens

test-warp-ui

Guides testing Warp UI features and changes using the computer use tool. Use this skill only when computer-use testing was requested (explicit request or accepted offer) and the computeruse tool is available to the agent. Covers launching Warp and verifying UI behavior.

warpdotdev/warp · 55 tokens