Getting it into your agent
One page per mod, every tool's command on it. A separate URL per tool would split the same page into five that compete with each other.
npx agentmods add skills/djrhails/dotfiles/xlsxnpx skills add DJRHails/dotfiles --skill xlsxgit clone --depth 1 https://github.com/DJRHails/dotfilesWrote this? Show the measurements
A badge with what this costs and how it scanned, read live from this page, so it follows the numbers instead of freezing them. Markdown for a README, HTML for a documentation site or a project page.
[](https://agentmods.dev/skills/djrhails/dotfiles/xlsx)<a href="https://agentmods.dev/skills/djrhails/dotfiles/xlsx"><img src="https://agentmods.dev/badge/skills/djrhails/dotfiles/xlsx.svg" alt="Measured on agentmods" height="20"></a>What it costs to keep this loaded
Counted locally with the o200k_base tokenizer, which is exact for GPT models; Claude uses its own tokenizer and its counts differ. Treat this as one consistent yardstick across the catalogue rather than a bill. Prices are per million input tokens.
| Model | Per session | Once invoked |
|---|---|---|
| Fable 5.1 | $0.00130 | $0.02703 |
| Opus 5 | $0.00065 | $0.01352 |
| Sonnet 5 | $0.00026 | $0.00541 |
| Haiku 4.5 | $0.00013 | $0.00270 |
Grade A, and why
xlsx scanned grade A with 0 findings against 26 rules in 11 categories — prompt injection, anti-refusal, data exfiltration, privilege escalation, supply chain, agent snooping, system-prompt leakage, SSRF and excessive agency — measured 2d ago.
A static scan of the body, not an audit. Every finding is printed with the line that produced it so you can judge whether it matters here. A mod is markdown that instructs an agent; that is exactly why what it instructs is worth reading.
Nothing flagged
None of the 26 patterns this scan looks for appear in this file: no shell pipes, no recursive deletes, no credential paths, no hidden text, no instruction-override or anti-refusal phrasing, no agent-config snooping. That is not a guarantee, it is the absence of the things that are checkable.
This is a copy
84% identical to xlsx — 37 lines differ, which has more behind it and is treated as the original. This page carries a canonical link to it rather than competing with it.
How it starts
The opening of the file, as written. The whole thing — 289 lines — stays where its author put it; the contents beside it link to each section on GitHub.
Requirements for Outputs
All Excel files
Zero Formula Errors
- Every Excel model MUST be delivered with ZERO formula errors (#REF!, #DIV/0!, #VALUE!, #N/A, #NAME?)
Preserve Existing Templates (when updating templates)
- Study and EXACTLY match existing format, style, and conventions when modifying files
- Never impose standardized formatting on files with established patterns
- Existing template conventions ALWAYS override these guidelines
Financial models
Color Coding Standards
Unless otherwise stated by the user or existing template
Industry-Standard Color Conventions
- Blue text (RGB: 0,0,255): Hardcoded inputs, and numbers users will change for scenarios
- Black text (RGB: 0,0,0): ALL formulas and calculations
- Green text (RGB: 0,128,0): Links pulling from other worksheets within same workbook
- Red text (RGB: 255,0,0): External links to other files
- Yellow background (RGB: 255,255,0): Key assumptions needing attention or cells that need to be updated
Number Formatting Standards
Required Format Rules
- Years: Format as text strings (e.g., "2024" not "2,024")
- Currency: Use $#,##0 format; ALWAYS specify units in headers ("Revenue ($mm)")
- Zeros: Use number formatting to make all zeros "-", including percentages (e.g., "$#,##0;($#,##0);-")
- Percentages: Default to 0.0% format (one decimal)
- Multiples: Format as 0.0x for valuation multiples (EV/EBITDA, P/E)
- Negative numbers: Use parentheses (123) not minus -123
Formula Construction Rules
Assumptions Placement
- Place ALL assumptions (growth rates, margins, multiples, etc.) in separate assumption cells
- Use cell references instead of hardcoded values in formulas
- Example: Use =B5*(1+$B$6) instead of =B5*1.05
Formula Error Prevention
- Verify all cell references are correct
- Check for off-by-one errors in ranges
- Ensure consistent formulas across all projection periods
- Test with edge cases (zero values, negative numbers)
- Verify no unintended circular references
What ships with it
2 files beside SKILL.md in the same directory: the scripts, references and assets a skill reads on demand. Not counted in the per-session cost; read them before you install if any of them is executable.
What this file has done since we first saw it
Hashed on every crawl. A supply-chain change to an agent config is a question of when, not whether, so the history is kept rather than the latest state alone.
- 2d ago First seen · 289 lines · 130 tokens per session scan A 7b56ed1aa7ae
xlsx is a skill published in the GitHub repository DJRHails/dotfiles (2 stars, last pushed today), licensed MIT. It adds 130 tokens to every session and 2,703 once invoked, about $0.0006 per session on Opus 5. A static security scan graded it A with 0 findings. It is 84% identical to xlsx, differing in 37 lines, and is treated as a copy.
Other skills, from other repositories
md2pdf
Convert a Markdown file to PDF with GitHub-style formatting using the md2pdf tool.
xlsx
Comprehensive spreadsheet creation, editing, and analysis with support for formulas, formatting, data analysis, and visualization. When Claude needs to work with spreadsheets (.xlsx, .xlsm, .csv, .tsv, etc) for: (1) Creating new spreadsheets with formulas and formatting, (2) Reading or analyzing data, (3) Modify…
xlsx
Create, edit, analyze, or convert Excel spreadsheets (.xlsx, .xlsm) where the workbook file is the primary deliverable. Use for formulas, formatting, financial models, multi-sheet workbooks, and tabular cleanup exported to Excel. Also applies to .csv/.tsv when the user wants spreadsheet output. Do NOT use for Word…
todoist-cli
Manage Todoist tasks, projects, labels, filters, sections, comments, reminders, and workspaces via the td CLI. Use when the user wants to view, create, update, complete, or organize Todoist items, or mentions tasks, inbox, today, upcoming, projects, labels, or filters.
autopilot-batch
Fan out a batch of autopilot-queued issues to parallel background worktree subagents — each runs /autopilot at the build model from its 'model:' label — with a gating review at Opus 5 or above and never below the build (Opus reviews Sonnet and Opus builds, Fable reviews Fable builds).
autopilot
Carry a well-scoped GitHub issue through the full dev loop autonomously, stopping at a per-run tier boundary (PR-ready, or merge+deploy for small reversible changes).