Getting it into your agent
One page per mod, every tool's command on it. A separate URL per tool would split the same page into five that compete with each other.
npx skills add equinor/neqsim-community-skills --skill neqsim-stage-gate-project-timelinegit clone --depth 1 https://github.com/equinor/neqsim-community-skillsWrote this? Show the measurements
A badge with what this costs and how it scanned, read live from this page, so it follows the numbers instead of freezing them. Markdown for a README, HTML for a documentation site or a project page.
[](https://agentmods.dev/skills/equinor/neqsim-community-skills/neqsim-stage-gate-project-timeline)<a href="https://agentmods.dev/skills/equinor/neqsim-community-skills/neqsim-stage-gate-project-timeline"><img src="https://agentmods.dev/badge/skills/equinor/neqsim-community-skills/neqsim-stage-gate-project-timeline/github.svg" alt="Measured on agentmods" height="20"></a>Or the 80×15 button, for a site that already has a row of RSS and ATOM ones. Only the verdict fits; the numbers stay here.
<a href="https://agentmods.dev/skills/equinor/neqsim-community-skills/neqsim-stage-gate-project-timeline"><img src="https://agentmods.dev/badge/skills/equinor/neqsim-community-skills/neqsim-stage-gate-project-timeline.svg" alt="Reviewed on agentmods" width="80" height="20"></a>What it costs to keep this loaded
Counted locally with the o200k_base tokenizer, which is exact for GPT models; Claude uses its own tokenizer and its counts differ. Treat this as one consistent yardstick across the catalogue rather than a bill. Prices are per million input tokens.
| Model | Per session | Once invoked |
|---|---|---|
| Fable 5.1 | $0.00102 | $0.01949 |
| Opus 5.5 | $0.00041 | $0.00780 |
| Sonnet 5.5 | $0.00020 | $0.00390 |
| Haiku 4.5 | $0.00010 | $0.00195 |
Grade A, and why
neqsim-stage-gate-project-timeline scanned grade A with 0 findings against 26 rules in 11 categories — prompt injection, anti-refusal, data exfiltration, privilege escalation, supply chain, agent snooping, system-prompt leakage, SSRF and excessive agency — measured 19d ago.
A static scan of the body, not an audit. Every finding is printed with the line that produced it so you can judge whether it matters here. A mod is markdown that instructs an agent; that is exactly why what it instructs is worth reading.
Nothing flagged
None of the 26 patterns this scan looks for appear in this file: no shell pipes, no recursive deletes, no credential paths, no hidden text, no instruction-override or anti-refusal phrasing, no agent-config snooping. That is not a guarantee, it is the absence of the things that are checkable.
How it starts
The opening of the file, as written. The whole thing — 134 lines — stays where its author put it; the contents beside it link to each section on GitHub.
Stage-Gate Project Timeline
Use this skill whenever a screening study would otherwise let a prospect produce, a host modification add capacity, or a host run past its technical life "whenever the optimiser wants". Real projects pass stage gates and are tied in at turnarounds; a decision taken today earns nothing for years. The skill turns that into explicit timelines so the value model, the ullage allocation and the report all use the same calendar.
When to Use
- Tie-in portfolio and timing (which prospects, when): the earliest first-oil year per prospect comes from its maturity, not from the first year with ullage.
- Host modification / debottleneck options with capex: the capacity is only available after study + DG1-DG3 + execution, at a shutdown; capex falls in the execution years, study cost earlier, opex after availability. Compare "ASAP" with "just in time for the first prospect that needs it".
- Host technical life (e.g. a technical-lifetime programme ending in year N with a pool of not-yet-sanctioned life-extension actions): when must the extension be decided, and what does it cost by year.
- Any report that needs a Gantt of the recommended portfolio and a capex calendar.
Inputs
- Prospect:
name,status(undrilled|discovered|appraised|sanctioned), optionalphase_yearsoverrides,decision_year,earliest_start_year(hard floor such as a licence milestone). - Host project:
id,name,capex_musd,study_cost_musd(default 5 % of capex),opex_musd_per_year,study_years(DG0),concept_years(DG1-DG3),execution_years,requires_shutdown(default true),earliest_decision_year. - Life extension:
programme_end_year,pool_by_year{year: MUSD} of unsanctioned actions,lead_years(default 5). - Optional turnaround calendar (default biennial from 2027).
Outputs
prospect_timeline: phases,first_production_year,exploration_year,sanction_year.project_timeline: phases,available_year,sanction_year,timing(asap|just_in_time),cost_by_year_musd.life_extension_timeline: phases,decision_deadline,cost_by_year_musd.portfolio_plan: Gantt rows for the chosen prospects (development phases slide to the chosen first oil, the exploration well stays at its earliest year - information first), the selected host projects scheduled just in time, the life-extension window, acapex_calendar_musdand DG3 / deadline milestones.plot_gantt: PNG (matplotlib, optional dependency).discounted: present value of a cost calendar.
What ships with it
6 files beside SKILL.md in the same directory: the scripts, references and assets a skill reads on demand. Not counted in the per-session cost; read them before you install if any of them is executable.
What this file has done since we first saw it
Hashed on every crawl. A supply-chain change to an agent config is a question of when, not whether, so the history is kept rather than the latest state alone.
- 19d ago First seen · 134 lines · 102 tokens per session scan A e222b74e19ea
neqsim-stage-gate-project-timeline is a skill published in the GitHub repository equinor/neqsim-community-skills (4 stars, last pushed today), licensed Apache-2.0. It adds 102 tokens to every session and 1,949 once invoked, about $0.0004 per session on Opus 5.5. A static security scan graded it A with 0 findings. No closer match exists in the catalogue, so it is treated as the original; first seen 2026-10-18.
neqsim-stage-gate-project-timeline compared with skills from other repositories
| Mod | Type | Stars | Last push | Licence | Scan | Tokens | Works with |
|---|---|---|---|---|---|---|---|
| neqsim-stage-gate-project-timelineequinor/neqsim-community-skills | Skill | 4 | today | Apache-2.0 | A | 102 | Claude Code, Codex |
| imagegenopenai/codex | Skill | 133k | yesterday | Apache-2.0 | A | 113 | Codex |
| playwright-climicrosoft/playwright | Skill | 99k | yesterday | Apache-2.0 | A | 19 | Claude Code |
| local-ai-agentsmicrosoft/ai-agents-for-beginners | Skill | 79k | 4d ago | MIT | A | 200 | Claude Code, Codex |
| systematic-debuggingobra/superpowers | Skill | 313k | 3d ago | MIT | A | 21 | Claude Code |
| next-cache-components-adoptionvercel/next.js | Skill | 143k | yesterday | MIT | A | 95 | Claude Code |
| next-partial-prefetching-adoptionvercel/next.js | Skill | 143k | yesterday | MIT | A | 103 | Claude Code |