Getting it into your agent
One page per mod, every tool's command on it. A separate URL per tool would split the same page into five that compete with each other.
npx skills add FortiumPartners/ai-mesh --skill smoke-test-critical-pathsgit clone --depth 1 https://github.com/FortiumPartners/ai-meshWrote this? Show the measurements
A badge with what this costs and how it scanned, read live from this page, so it follows the numbers instead of freezing them. Markdown for a README, HTML for a documentation site or a project page.
[](https://agentmods.dev/skills/fortiumpartners/ai-mesh/smoke-test-critical-paths)<a href="https://agentmods.dev/skills/fortiumpartners/ai-mesh/smoke-test-critical-paths"><img src="https://agentmods.dev/badge/skills/fortiumpartners/ai-mesh/smoke-test-critical-paths/github.svg" alt="Measured on agentmods" height="20"></a>Or the 80×15 button, for a site that already has a row of RSS and ATOM ones. Only the verdict fits; the numbers stay here.
<a href="https://agentmods.dev/skills/fortiumpartners/ai-mesh/smoke-test-critical-paths"><img src="https://agentmods.dev/badge/skills/fortiumpartners/ai-mesh/smoke-test-critical-paths.svg" alt="Reviewed on agentmods" width="80" height="20"></a>What it costs to keep this loaded
Counted locally with the o200k_base tokenizer, which is exact for GPT models; Claude uses its own tokenizer and its counts differ. Treat this as one consistent yardstick across the catalogue rather than a bill. Prices are per million input tokens.
| Model | Per session | Once invoked |
|---|---|---|
| Fable 5.1 | $0.00000 | $0.00417 |
| Opus 5 | $0.00000 | $0.00209 |
| Sonnet 5 | $0.00000 | $0.00083 |
| Haiku 4.5 | $0.00000 | $0.00042 |
Grade A, and why
smoke-test-critical-paths scanned grade A with 0 findings against 26 rules in 11 categories — prompt injection, anti-refusal, data exfiltration, privilege escalation, supply chain, agent snooping, system-prompt leakage, SSRF and excessive agency — measured 12d ago.
A static scan of the body, not an audit. Every finding is printed with the line that produced it so you can judge whether it matters here. A mod is markdown that instructs an agent; that is exactly why what it instructs is worth reading.
Nothing flagged
None of the 26 patterns this scan looks for appear in this file: no shell pipes, no recursive deletes, no credential paths, no hidden text, no instruction-override or anti-refusal phrasing, no agent-config snooping. That is not a guarantee, it is the absence of the things that are checkable.
The source is not reproduced here
No licence file
A repository with no LICENSE is all rights reserved by default, so the body is not copied here. The metadata, the measurements and the link are.
What ships with it
2 files beside SKILL.md in the same directory: the scripts, references and assets a skill reads on demand. Not counted in the per-session cost; read them before you install if any of them is executable.
What this file has done since we first saw it
Hashed on every crawl. A supply-chain change to an agent config is a question of when, not whether, so the history is kept rather than the latest state alone.
- 12d ago First seen · 67 lines · 0 tokens per session scan A c716f5997271
smoke-test-critical-paths is a skill published in the GitHub repository FortiumPartners/ai-mesh (11 stars, last pushed 9mo ago), with no licence file. It costs nothing until one of its globs matches a file; then it loads 417 tokens. A static security scan graded it A with 0 findings. No closer match exists in the catalogue, so it is treated as the original; first seen 2026-08-30.
Other skills, from other repositories
dogfood
Systematically explore and test a mobile app on iOS/Android with agent-device to find bugs, UX issues, and other problems. Use when asked to dogfood, QA, exploratory test, find issues, bug hunt, or test this app on mobile.
test-warp-ui
Guides testing Warp UI features and changes using the computer use tool. Use this skill only when computer-use testing was requested (explicit request or accepted offer) and the computeruse tool is available to the agent. Covers launching Warp and verifying UI behavior.
test-electron-app
Drive the real running PostHog Electron app (live tRPC, workspace-server, real data) over CDP with agent-browser. Connect to the running app on port 9222, test desktop changes against a local Django stack, snapshot the accessibility tree, inspect network requests, and screenshot only when explicitly asked. Use when…
pyats-dynamic-test
Generate and execute deterministic pyATS aetest validation scripts - interface state, OSPF neighbors, BGP paths, ping matrices, and custom compliance tests. Use when writing a network test, validating post-change state, running pass/fail checks, or building automated regression tests.
test-loop
Plan, generate, and heal an executable E2E test suite from approved acceptance criteria (web and mobile).
playwright-cli
Automates browser interactions for testing and validating your own web applications using playwright-cli. Use when you need terminal-first browser control for navigation, form filling, screenshots, tracing, bound browser sessions, debugging, or generating Playwright test code. Only use against applications you own or…