draft-expert-report-on-construction-delay-and-damages

draft-expert-report-on-construction-delay-and-damages is a skill for Claude Code, Codex from HHHHHejia/awesome-legal-aiagent-skills. It costs 50 tokens per session (1,590 once invoked), scanned A, original, no licence file.

A construction expert report examining whether project delays happened at the same time and how those delays affected losses.

In plain words
What is it for?
Use it to prepare an expert report on construction delay responsibility, delay-related damages, schedule float, and conflicting project records.
Why use it?
It helps apply the contract's rules for overlapping delays, unused schedule time, and office overhead, while exposing inconsistencies across documents.

Skill for Claude CodeCodex

Which agent this was written for is unclear — body not stored (licence); the path alone says nothing.

Good fit Use it to prepare an expert report on construction delay responsibility, delay-related damages, schedule float, and conflicting project records.

Compare 6 skills from other repositories ↓
Install with agentmods
npx agentmods add skills/hhhhhejia/awesome-legal-aiagent-skills/draft-expert-report-on-construction-delay-and-damages
Install

Getting it into your agent

One page per mod, every tool's command on it. A separate URL per tool would split the same page into five that compete with each other.

Any agent
npx skills add HHHHHejia/awesome-legal-aiagent-skills --skill draft-expert-report-on-construction-delay-and-damages
Clone the repo
git clone --depth 1 https://github.com/HHHHHejia/awesome-legal-aiagent-skills

Made for: Claude Code, Codex.

Wrote this? Show the measurements

A badge with what this costs and how it scanned, read live from this page, so it follows the numbers instead of freezing them. Markdown for a README, HTML for a documentation site or a project page.

agentmods badge for draft-expert-report-on-construction-delay-and-damages

README.md
[![agentmods](https://agentmods.dev/badge/skills/hhhhhejia/awesome-legal-aiagent-skills/draft-expert-report-on-construction-delay-and-damages/github.svg)](https://agentmods.dev/skills/hhhhhejia/awesome-legal-aiagent-skills/draft-expert-report-on-construction-delay-and-damages)
Your own site
<a href="https://agentmods.dev/skills/hhhhhejia/awesome-legal-aiagent-skills/draft-expert-report-on-construction-delay-and-damages"><img src="https://agentmods.dev/badge/skills/hhhhhejia/awesome-legal-aiagent-skills/draft-expert-report-on-construction-delay-and-damages/github.svg" alt="Measured on agentmods" height="20"></a>

Or the 80×15 button, for a site that already has a row of RSS and ATOM ones. Only the verdict fits; the numbers stay here.

agentmods 80×15 button for draft-expert-report-on-construction-delay-and-damages

Your own site · 80×15
<a href="https://agentmods.dev/skills/hhhhhejia/awesome-legal-aiagent-skills/draft-expert-report-on-construction-delay-and-damages"><img src="https://agentmods.dev/badge/skills/hhhhhejia/awesome-legal-aiagent-skills/draft-expert-report-on-construction-delay-and-damages.svg" alt="Reviewed on agentmods" width="80" height="20"></a>
Per session 50 Skills are progressive disclosure: only the name and description are preloaded; the body loads when the skill is used.
When invoked 1,590 The whole file, excluding the scripts and references it only reads on demand.
Security scan A 0 findings. A grade says what 26 rules found in the file — not that it is safe.
Origin unknown No closer match found in the catalogue.
Token cost

What it costs to keep this loaded

Counted locally with the o200k_base tokenizer, which is exact for GPT models; Claude uses its own tokenizer and its counts differ. Treat this as one consistent yardstick across the catalogue rather than a bill. Prices are per million input tokens.

ModelPer sessionOnce invoked
Fable 5.1 $0.00050 $0.01590
Opus 5.5 $0.00020 $0.00636
Sonnet 5.5 $0.00010 $0.00318
Haiku 4.5 $0.00005 $0.00159

Measured 2mo ago against content hash 1ade73f6169c, method: parsed. Prices are Anthropic first-party input rates as of 2026-10-07, from the pricing page.

Security

Grade A, and why

draft-expert-report-on-construction-delay-and-damages scanned grade A with 0 findings against 26 rules in 11 categories — prompt injection, anti-refusal, data exfiltration, privilege escalation, supply chain, agent snooping, system-prompt leakage, SSRF and excessive agency — measured 2mo ago.

A static scan of the body, not an audit. Every finding is printed with the line that produced it so you can judge whether it matters here. A mod is markdown that instructs an agent; that is exactly why what it instructs is worth reading.

Nothing flagged

None of the 26 patterns this scan looks for appear in this file: no shell pipes, no recursive deletes, no credential paths, no hidden text, no instruction-override or anti-refusal phrasing, no agent-config snooping. That is not a guarantee, it is the absence of the things that are checkable.

arbitration-international-dispute-resolution/draft-expert-report-on-construction-delay-and-damages/SKILL.md · 111 lines

The source is not reproduced here

No licence file

A repository with no LICENSE is all rights reserved by default, so the body is not copied here. The metadata, the measurements and the link are.

Read it on GitHub

Changes

What this file has done since we first saw it

Hashed on every crawl. A supply-chain change to an agent config is a question of when, not whether, so the history is kept rather than the latest state alone.

  1. 2mo ago First seen · 111 lines · 50 tokens per session scan A 1ade73f6169c

Subscribe to this mod's changes

draft-expert-report-on-construction-delay-and-damages is a skill published in the GitHub repository HHHHHejia/awesome-legal-aiagent-skills (38 stars, last pushed 5mo ago), with no licence file. It adds 50 tokens to every session and 1,590 once invoked, about $0.0002 per session on Opus 5.5. A static security scan graded it A with 0 findings. No closer match exists in the catalogue, so it is treated as the original; first seen 2026-08-30.

Related

draft-expert-report-on-construction-delay-and-damages compared with skills from other repositories

draft-expert-report-on-construction-delay-and-damages next to 6 skills from other repositories
ModTypeStarsLast pushLicenceScanTokensWorks with
draft-expert-report-on-construction-delay-and-damagesHHHHHejia/awesome-legal-aiagent-skillsSkill385mo agononeA50Claude Code, Codex
fto-triageanthropics/claude-for-legalSkill10.0k3d agoApache-2.0A81Claude Code
legal-holdanthropics/claude-for-legalSkill10.0k3d agoApache-2.0A68Claude Code
specification-writingwanshuiyin/Auto-claude-code-research-in-sleepSkill19kyesterdayMITA49Claude Code
regulatory-research-fallbackHKUDS/OpenSpaceSkill7.9k5d agoMITA20Claude Code, Codex
terms-of-servicegenspark-ai/genofficeSkill12kyesterdayApache-2.0A32Claude Code, Codex
x-scorecardx-cmd/x-cmdSkill4.7k12d agoApache-2.0A57Claude Code, Codex