Getting it into your agent
One page per mod, every tool's command on it. A separate URL per tool would split the same page into five that compete with each other.
npx agentmods add skills/luizedupp/rememb/xlsxnpx skills add LuizEduPP/Rememb --skill xlsxgit clone --depth 1 https://github.com/LuizEduPP/RemembWrote this? Show the measurements
A badge with what this costs and how it scanned, read live from this page, so it follows the numbers instead of freezing them. Markdown for a README, HTML for a documentation site or a project page.
[](https://agentmods.dev/skills/luizedupp/rememb/xlsx)<a href="https://agentmods.dev/skills/luizedupp/rememb/xlsx"><img src="https://agentmods.dev/badge/skills/luizedupp/rememb/xlsx.svg" alt="Measured on agentmods" height="20"></a>What it costs to keep this loaded
Counted locally with the o200k_base tokenizer, which is exact for GPT models; Claude uses its own tokenizer and its counts differ. Treat this as one consistent yardstick across the catalogue rather than a bill. Prices are per million input tokens.
| Model | Per session | Once invoked |
|---|---|---|
| Fable 5 | $0.00053 | $0.02770 |
| Opus 5 | $0.00026 | $0.01385 |
| Sonnet 5 | $0.00011 | $0.00554 |
| Haiku 4.5 | $0.00005 | $0.00277 |
Grade A, and why
xlsx scanned grade A with 0 findings against 26 rules in 11 categories — prompt injection, anti-refusal, data exfiltration, privilege escalation, supply chain, agent snooping, system-prompt leakage, SSRF and excessive agency — measured 3d ago.
A static scan of the body, not an audit. Every finding is printed with the line that produced it so you can judge whether it matters here. A mod is markdown that instructs an agent; that is exactly why what it instructs is worth reading.
Nothing flagged
None of the 26 patterns this scan looks for appear in this file: no shell pipes, no recursive deletes, no credential paths, no hidden text, no instruction-override or anti-refusal phrasing, no agent-config snooping. That is not a guarantee, it is the absence of the things that are checkable.
This is a copy
86% identical to xlsx — 36 lines differ, which has more behind it and is treated as the original. This page carries a canonical link to it rather than competing with it.
How it starts
The opening of the file, as written. The whole thing — 308 lines — stays where its author put it; the contents beside it link to each section on GitHub.
Requirements for Outputs
All Excel files
Professional Font
- Use a consistent, professional font (e.g., Arial, Times New Roman) for all deliverables unless otherwise instructed by the user
Zero Formula Errors
- Every Excel model MUST be delivered with ZERO formula errors (#REF!, #DIV/0!, #VALUE!, #N/A, #NAME?)
Preserve Existing Templates (when updating templates)
- Study and EXACTLY match existing format, style, and conventions when modifying files
- Never impose standardized formatting on files with established patterns
- Existing template conventions ALWAYS override these guidelines
Financial models
Color Coding Standards
Unless otherwise stated by the user or existing template
Industry-Standard Color Conventions
- Blue text (RGB: 0,0,255): Hardcoded inputs, and numbers users will change for scenarios
- Black text (RGB: 0,0,0): ALL formulas and calculations
- Green text (RGB: 0,128,0): Links pulling from other worksheets within same workbook
- Red text (RGB: 255,0,0): External links to other files
- Yellow background (RGB: 255,255,0): Key assumptions needing attention or cells that need to be updated
Number Formatting Standards
Required Format Rules
- Years: Format as text strings (e.g., "2024" not "2,024")
- Currency: Use $#,##0 format; ALWAYS specify units in headers ("Revenue ($mm)")
- Zeros: Use number formatting to make all zeros "-", including percentages (e.g., "$#,##0;($#,##0);-")
- Percentages: Default to 0.0% format (one decimal)
- Multiples: Format as 0.0x for valuation multiples (EV/EBITDA, P/E)
- Negative numbers: Use parentheses (123) not minus -123
Formula Construction Rules
Assumptions Placement
- Place ALL assumptions (growth rates, margins, multiples, etc.) in separate assumption cells
- Use cell references instead of hardcoded values in formulas
- Example: Use =B5*(1+$B$6) instead of =B5*1.05
Formula Error Prevention
- Verify all cell references are correct
- Check for off-by-one errors in ranges
- Ensure consistent formulas across all projection periods
- Test with edge cases (zero values, negative numbers)
- Verify no unintended circular references
What ships with it
53 files beside SKILL.md in the same directory: the scripts, references and assets a skill reads on demand. Not counted in the per-session cost; read them before you install if any of them is executable.
- LICENSE.txt 1.4 KB
- scripts/office/helpers/__init__.py 0 B runs code
- scripts/office/helpers/merge_runs.py 5.4 KB runs code
- scripts/office/helpers/simplify_redlines.py 5.6 KB runs code
- scripts/office/pack.py 4.9 KB runs code
- scripts/office/schemas/ecma/fouth-edition/opc-contentTypes.xsd 1.9 KB
- scripts/office/schemas/ecma/fouth-edition/opc-coreProperties.xsd 2.5 KB
- scripts/office/schemas/ecma/fouth-edition/opc-digSig.xsd 2.8 KB
- scripts/office/schemas/ecma/fouth-edition/opc-relationships.xsd 1.3 KB
- scripts/office/schemas/ISO-IEC29500-4_2016/dml-chart.xsd 73 KB
- scripts/office/schemas/ISO-IEC29500-4_2016/dml-chartDrawing.xsd 6.8 KB
- scripts/office/schemas/ISO-IEC29500-4_2016/dml-diagram.xsd 50 KB
- scripts/office/schemas/ISO-IEC29500-4_2016/dml-lockedCanvas.xsd 624 B
- scripts/office/schemas/ISO-IEC29500-4_2016/dml-main.xsd 148 KB
- scripts/office/schemas/ISO-IEC29500-4_2016/dml-picture.xsd 1.2 KB
- scripts/office/schemas/ISO-IEC29500-4_2016/dml-spreadsheetDrawing.xsd 8.7 KB
- scripts/office/schemas/ISO-IEC29500-4_2016/dml-wordprocessingDrawing.xsd 14 KB
- scripts/office/schemas/ISO-IEC29500-4_2016/pml.xsd 82 KB
- scripts/office/schemas/ISO-IEC29500-4_2016/shared-additionalCharacteristics.xsd 1.2 KB
- scripts/office/schemas/ISO-IEC29500-4_2016/shared-bibliography.xsd 7.2 KB
- scripts/office/schemas/ISO-IEC29500-4_2016/shared-commonSimpleTypes.xsd 6.2 KB
- scripts/office/schemas/ISO-IEC29500-4_2016/shared-customXmlDataProperties.xsd 1.2 KB
- scripts/office/schemas/ISO-IEC29500-4_2016/shared-customXmlSchemaProperties.xsd 880 B
- scripts/office/schemas/ISO-IEC29500-4_2016/shared-documentPropertiesCustom.xsd 2.5 KB
- scripts/office/schemas/ISO-IEC29500-4_2016/shared-documentPropertiesExtended.xsd 3.4 KB
- scripts/office/schemas/ISO-IEC29500-4_2016/shared-documentPropertiesVariantTypes.xsd 7.3 KB
- scripts/office/schemas/ISO-IEC29500-4_2016/shared-math.xsd 23 KB
- scripts/office/schemas/ISO-IEC29500-4_2016/shared-relationshipReference.xsd 1.3 KB
- scripts/office/schemas/ISO-IEC29500-4_2016/sml.xsd 237 KB
- scripts/office/schemas/ISO-IEC29500-4_2016/vml-main.xsd 26 KB
- scripts/office/schemas/ISO-IEC29500-4_2016/vml-officeDrawing.xsd 25 KB
- scripts/office/schemas/ISO-IEC29500-4_2016/vml-presentationDrawing.xsd 535 B
- scripts/office/schemas/ISO-IEC29500-4_2016/vml-spreadsheetDrawing.xsd 5.6 KB
- scripts/office/schemas/ISO-IEC29500-4_2016/vml-wordprocessingDrawing.xsd 3.9 KB
- scripts/office/schemas/ISO-IEC29500-4_2016/wml.xsd 167 KB
- scripts/office/schemas/ISO-IEC29500-4_2016/xml.xsd 4.5 KB
- scripts/office/schemas/mce/mc.xsd 3.1 KB
- scripts/office/schemas/microsoft/wml-2010.xsd 26 KB
- scripts/office/schemas/microsoft/wml-2012.xsd 3.7 KB
- scripts/office/schemas/microsoft/wml-2018.xsd 901 B
- scripts/office/schemas/microsoft/wml-cex-2018.xsd 1.7 KB
- scripts/office/schemas/microsoft/wml-cid-2016.xsd 1002 B
- scripts/office/schemas/microsoft/wml-sdtdatahash-2020.xsd 600 B
- scripts/office/schemas/microsoft/wml-symex-2015.xsd 745 B
- scripts/office/soffice.py 5.2 KB runs code
- scripts/office/unpack.py 4.0 KB runs code
- scripts/office/validate.py 3.6 KB runs code
- scripts/office/validators/__init__.py 336 B runs code
- scripts/office/validators/base.py 32 KB runs code
- scripts/office/validators/docx.py 16 KB runs code
- scripts/office/validators/pptx.py 9.6 KB runs code
- scripts/office/validators/redlining.py 8.7 KB runs code
- scripts/recalc.py 5.7 KB runs code
What this file has done since we first saw it
Hashed on every crawl. A supply-chain change to an agent config is a question of when, not whether, so the history is kept rather than the latest state alone.
- 3d ago First seen · 308 lines · 53 tokens per session scan A 9291fdf74050
xlsx is a skill published in the GitHub repository LuizEduPP/Rememb (4 stars, last pushed 1mo ago), licensed MIT. It adds 53 tokens to every session and 2,770 once invoked, about $0.0003 per session on Opus 5. A static security scan graded it A with 0 findings. It is 86% identical to xlsx, differing in 36 lines, and is treated as a copy.
Other skills, from other repositories
ingest
Ingest a file or URL into the memory graph. Handles local files (text, PDF, DOCX, XLSX, images, etc.) and URLs (web pages, YouTube, Wikipedia, RSS). Use when the user wants to add any document or web content to their knowledge graph.
frontend-slides
Create stunning, animation-rich HTML presentations from scratch or by converting PowerPoint files. Use when the user wants to build a presentation, convert a PPT/PPTX to web, or create slides for a talk/pitch. Helps non-designers discover their aesthetic through visual exploration rather than abstract choices.
wowerpoint
Turn one document into a kawaii NotebookLM slide-deck PDF. Use for "wowerpoint this", "make a deck about ", "turn this report into slides", or any request to render a single document as shareable narrative slides.
honcho-integration
Integrate Honcho memory into existing Python or TypeScript codebases. Use when adding Honcho SDK, setting up peers, configuring sessions, and accessing Honcho's representation.
verify
Build, launch, and drive a local Honcho stack to verify a change at its runtime surface (the /v3 HTTP API and the deriver queue). Use when verifying a diff or confirming a change works in the running app.
mnemo-cortex
Installs and wires Mnemo Cortex (local-first persistent memory) into OpenClaw and other MCP-capable agents. Use for cross-session recall, decision history, or multi-agent shared memory.