Getting it into your agent
One page per mod, every tool's command on it. A separate URL per tool would split the same page into five that compete with each other.
npx skills add raoulstongea/open-jobsite --skill change-ordergit clone --depth 1 https://github.com/raoulstongea/open-jobsiteWrote this? Show the measurements
A badge with what this costs and how it scanned, read live from this page, so it follows the numbers instead of freezing them. Markdown for a README, HTML for a documentation site or a project page.
[](https://agentmods.dev/skills/raoulstongea/open-jobsite/change-order)<a href="https://agentmods.dev/skills/raoulstongea/open-jobsite/change-order"><img src="https://agentmods.dev/badge/skills/raoulstongea/open-jobsite/change-order/github.svg" alt="Measured on agentmods" height="20"></a>Or the 80×15 button, for a site that already has a row of RSS and ATOM ones. Only the verdict fits; the numbers stay here.
<a href="https://agentmods.dev/skills/raoulstongea/open-jobsite/change-order"><img src="https://agentmods.dev/badge/skills/raoulstongea/open-jobsite/change-order.svg" alt="Reviewed on agentmods" width="80" height="20"></a>What it costs to keep this loaded
Counted locally with the o200k_base tokenizer, which is exact for GPT models; Claude uses its own tokenizer and its counts differ. Treat this as one consistent yardstick across the catalogue rather than a bill. Prices are per million input tokens.
| Model | Per session | Once invoked |
|---|---|---|
| Fable 5.1 | $0.00016 | $0.00178 |
| Opus 5.5 | $0.00006 | $0.00071 |
| Sonnet 5.5 | $0.00003 | $0.00036 |
| Haiku 4.5 | $0.00002 | $0.00018 |
Grade A, and why
change-order scanned grade A with 0 findings against 26 rules in 11 categories — prompt injection, anti-refusal, data exfiltration, privilege escalation, supply chain, agent snooping, system-prompt leakage, SSRF and excessive agency — measured 2mo ago.
A static scan of the body, not an audit. Every finding is printed with the line that produced it so you can judge whether it matters here. A mod is markdown that instructs an agent; that is exactly why what it instructs is worth reading.
Nothing flagged
None of the 26 patterns this scan looks for appear in this file: no shell pipes, no recursive deletes, no credential paths, no hidden text, no instruction-override or anti-refusal phrasing, no agent-config snooping. That is not a guarantee, it is the absence of the things that are checkable.
What it actually says
Change Order
- Identify the original scope, discovered condition or requested change, date, and supporting evidence.
- Record the evidence and distinguish observed facts from proposed work.
- Confirm cost items, currency, schedule impact, assumptions, and exclusions.
- Call
draft_change_orderwith evidence-linked line items. - Present the reason, cost change, schedule change, missing contract information, and approval warning.
- Stop for explicit human and contractual review. Never issue, sign, approve, invoice, schedule, or start changed work through this workflow.
If safety, structural conditions, hazardous materials, permits, or code issues may be involved, surface the concern and direct the user to the appropriate qualified professional rather than making a determination.
What this file has done since we first saw it
Hashed on every crawl. A supply-chain change to an agent config is a question of when, not whether, so the history is kept rather than the latest state alone.
- 2mo ago First seen · 21 lines · 16 tokens per session scan A 0a86bec572db
change-order is a skill published in the GitHub repository raoulstongea/open-jobsite (0 stars, last pushed 2mo ago), licensed Apache-2.0. It adds 16 tokens to every session and 178 once invoked, about $0.0001 per session on Opus 5.5. A static security scan graded it A with 0 findings. No closer match exists in the catalogue, so it is treated as the original; first seen 2026-08-31.
change-order compared with skills from other repositories
| Mod | Type | Stars | Last push | Licence | Scan | Tokens | Works with |
|---|---|---|---|---|---|---|---|
| change-orderraoulstongea/open-jobsite | Skill | 0 | 2mo ago | Apache-2.0 | A | 16 | Claude Code, Codex |
| html-ppt-zhangzara-stencil-tabletnexu-io/open-design | Skill | 107k | today | Apache-2.0 | A | 49 | Claude Code, Codex |
| treatment-plansK-Dense-AI/scientific-agent-skills | Skill | 56k | 6d ago | MIT | A | 62 | Claude Code, Codex |
| legal-holdanthropics/claude-for-legal | Skill | 9.9k | yesterday | Apache-2.0 | A | 68 | Claude Code |
| handbook-updatesanthropics/claude-for-legal | Skill | 9.9k | yesterday | Apache-2.0 | A | 52 | Claude Code |
| terms-of-servicegenspark-ai/genoffice | Skill | 12k | today | Apache-2.0 | A | 32 | Claude Code, Codex |
| software-copyright-materialsFokkyp/SoftwareCopyright-Skill | Skill | 6.3k | 15d ago | AGPL-3.0 | A | 98 | Claude Code, Codex |