Getting it into your agent
One page per mod, every tool's command on it. A separate URL per tool would split the same page into five that compete with each other.
npx agentmods add skills/thtskaran/claude-skills/xlsxnpx skills add thtskaran/claude-skills --skill xlsxgit clone --depth 1 https://github.com/thtskaran/claude-skillsWrote this? Show the measurements
A badge with what this costs and how it scanned, read live from this page, so it follows the numbers instead of freezing them. Markdown for a README, HTML for a documentation site or a project page.
[](https://agentmods.dev/skills/thtskaran/claude-skills/xlsx)<a href="https://agentmods.dev/skills/thtskaran/claude-skills/xlsx"><img src="https://agentmods.dev/badge/skills/thtskaran/claude-skills/xlsx.svg" alt="Measured on agentmods" height="20"></a>What it costs to keep this loaded
Counted locally with the o200k_base tokenizer, which is exact for GPT models; Claude uses its own tokenizer and its counts differ. Treat this as one consistent yardstick across the catalogue rather than a bill. Prices are per million input tokens.
| Model | Per session | Once invoked |
|---|---|---|
| Fable 5.1 | $0.00201 | $0.02835 |
| Opus 5 | $0.00101 | $0.01418 |
| Sonnet 5 | $0.00040 | $0.00567 |
| Haiku 4.5 | $0.00020 | $0.00283 |
Grade A, and why
xlsx scanned grade A with 0 findings against 26 rules in 11 categories — prompt injection, anti-refusal, data exfiltration, privilege escalation, supply chain, agent snooping, system-prompt leakage, SSRF and excessive agency — measured 6d ago.
A static scan of the body, not an audit. Every finding is printed with the line that produced it so you can judge whether it matters here. A mod is markdown that instructs an agent; that is exactly why what it instructs is worth reading.
Nothing flagged
None of the 26 patterns this scan looks for appear in this file: no shell pipes, no recursive deletes, no credential paths, no hidden text, no instruction-override or anti-refusal phrasing, no agent-config snooping. That is not a guarantee, it is the absence of the things that are checkable.
This is a copy
92% identical to xlsx — 18 lines differ, which has more behind it and is treated as the original. This page carries a canonical link to it rather than competing with it.
How it starts
The opening of the file, as written. The whole thing — 292 lines — stays where its author put it; the contents beside it link to each section on GitHub.
Requirements for Outputs
All Excel files
Professional Font
- Use a consistent, professional font (e.g., Arial, Times New Roman) for all deliverables unless otherwise instructed by the user
Zero Formula Errors
- Every Excel model MUST be delivered with ZERO formula errors (#REF!, #DIV/0!, #VALUE!, #N/A, #NAME?)
Preserve Existing Templates (when updating templates)
- Study and EXACTLY match existing format, style, and conventions when modifying files
- Never impose standardized formatting on files with established patterns
- Existing template conventions ALWAYS override these guidelines
Financial models
Color Coding Standards
Unless otherwise stated by the user or existing template
Industry-Standard Color Conventions
- Blue text (RGB: 0,0,255): Hardcoded inputs, and numbers users will change for scenarios
- Black text (RGB: 0,0,0): ALL formulas and calculations
- Green text (RGB: 0,128,0): Links pulling from other worksheets within same workbook
- Red text (RGB: 255,0,0): External links to other files
- Yellow background (RGB: 255,255,0): Key assumptions needing attention or cells that need to be updated
Number Formatting Standards
Required Format Rules
- Years: Format as text strings (e.g., "2024" not "2,024")
- Currency: Use $#,##0 format; ALWAYS specify units in headers ("Revenue ($mm)")
- Zeros: Use number formatting to make all zeros "-", including percentages (e.g., "$#,##0;($#,##0);-")
- Percentages: Default to 0.0% format (one decimal)
- Multiples: Format as 0.0x for valuation multiples (EV/EBITDA, P/E)
- Negative numbers: Use parentheses (123) not minus -123
Formula Construction Rules
Assumptions Placement
- Place ALL assumptions (growth rates, margins, multiples, etc.) in separate assumption cells
- Use cell references instead of hardcoded values in formulas
- Example: Use =B5*(1+$B$6) instead of =B5*1.05
Formula Error Prevention
- Verify all cell references are correct
- Check for off-by-one errors in ranges
- Ensure consistent formulas across all projection periods
- Test with edge cases (zero values, negative numbers)
- Verify no unintended circular references
What ships with it
53 files beside SKILL.md in the same directory: the scripts, references and assets a skill reads on demand. Not counted in the per-session cost; read them before you install if any of them is executable.
- LICENSE.txt 1.4 KB
- scripts/office/helpers/__init__.py 0 B runs code
- scripts/office/helpers/merge_runs.py 5.4 KB runs code
- scripts/office/helpers/simplify_redlines.py 5.6 KB runs code
- scripts/office/pack.py 4.9 KB runs code
- scripts/office/schemas/ecma/fouth-edition/opc-contentTypes.xsd 2.0 KB
- scripts/office/schemas/ecma/fouth-edition/opc-coreProperties.xsd 2.5 KB
- scripts/office/schemas/ecma/fouth-edition/opc-digSig.xsd 2.8 KB
- scripts/office/schemas/ecma/fouth-edition/opc-relationships.xsd 1.3 KB
- scripts/office/schemas/ISO-IEC29500-4_2016/dml-chart.xsd 75 KB
- scripts/office/schemas/ISO-IEC29500-4_2016/dml-chartDrawing.xsd 6.8 KB
- scripts/office/schemas/ISO-IEC29500-4_2016/dml-diagram.xsd 51 KB
- scripts/office/schemas/ISO-IEC29500-4_2016/dml-lockedCanvas.xsd 624 B
- scripts/office/schemas/ISO-IEC29500-4_2016/dml-main.xsd 151 KB
- scripts/office/schemas/ISO-IEC29500-4_2016/dml-picture.xsd 1.2 KB
- scripts/office/schemas/ISO-IEC29500-4_2016/dml-spreadsheetDrawing.xsd 8.7 KB
- scripts/office/schemas/ISO-IEC29500-4_2016/dml-wordprocessingDrawing.xsd 15 KB
- scripts/office/schemas/ISO-IEC29500-4_2016/pml.xsd 83 KB
- scripts/office/schemas/ISO-IEC29500-4_2016/shared-additionalCharacteristics.xsd 1.2 KB
- scripts/office/schemas/ISO-IEC29500-4_2016/shared-bibliography.xsd 7.2 KB
- scripts/office/schemas/ISO-IEC29500-4_2016/shared-commonSimpleTypes.xsd 6.4 KB
- scripts/office/schemas/ISO-IEC29500-4_2016/shared-customXmlDataProperties.xsd 1.2 KB
- scripts/office/schemas/ISO-IEC29500-4_2016/shared-customXmlSchemaProperties.xsd 880 B
- scripts/office/schemas/ISO-IEC29500-4_2016/shared-documentPropertiesCustom.xsd 2.5 KB
- scripts/office/schemas/ISO-IEC29500-4_2016/shared-documentPropertiesExtended.xsd 3.4 KB
- scripts/office/schemas/ISO-IEC29500-4_2016/shared-documentPropertiesVariantTypes.xsd 7.3 KB
- scripts/office/schemas/ISO-IEC29500-4_2016/shared-math.xsd 23 KB
- scripts/office/schemas/ISO-IEC29500-4_2016/shared-relationshipReference.xsd 1.3 KB
- scripts/office/schemas/ISO-IEC29500-4_2016/sml.xsd 241 KB
- scripts/office/schemas/ISO-IEC29500-4_2016/vml-main.xsd 26 KB
- scripts/office/schemas/ISO-IEC29500-4_2016/vml-officeDrawing.xsd 25 KB
- scripts/office/schemas/ISO-IEC29500-4_2016/vml-presentationDrawing.xsd 535 B
- scripts/office/schemas/ISO-IEC29500-4_2016/vml-spreadsheetDrawing.xsd 5.6 KB
- scripts/office/schemas/ISO-IEC29500-4_2016/vml-wordprocessingDrawing.xsd 3.9 KB
- scripts/office/schemas/ISO-IEC29500-4_2016/wml.xsd 167 KB
- scripts/office/schemas/ISO-IEC29500-4_2016/xml.xsd 4.7 KB
- scripts/office/schemas/mce/mc.xsd 3.1 KB
- scripts/office/schemas/microsoft/wml-2010.xsd 26 KB
- scripts/office/schemas/microsoft/wml-2012.xsd 3.7 KB
- scripts/office/schemas/microsoft/wml-2018.xsd 901 B
- scripts/office/schemas/microsoft/wml-cex-2018.xsd 1.7 KB
- scripts/office/schemas/microsoft/wml-cid-2016.xsd 1002 B
- scripts/office/schemas/microsoft/wml-sdtdatahash-2020.xsd 600 B
- scripts/office/schemas/microsoft/wml-symex-2015.xsd 745 B
- scripts/office/soffice.py 5.2 KB runs code
- scripts/office/unpack.py 4.0 KB runs code
- scripts/office/validate.py 3.6 KB runs code
- scripts/office/validators/__init__.py 336 B runs code
- scripts/office/validators/base.py 32 KB runs code
- scripts/office/validators/docx.py 16 KB runs code
- scripts/office/validators/pptx.py 9.6 KB runs code
- scripts/office/validators/redlining.py 8.7 KB runs code
- scripts/recalc.py 5.6 KB runs code
What this file has done since we first saw it
Hashed on every crawl. A supply-chain change to an agent config is a question of when, not whether, so the history is kept rather than the latest state alone.
- 6d ago First seen · 292 lines · 201 tokens per session scan A dd316db7785a
xlsx is a skill published in the GitHub repository thtskaran/claude-skills (18 stars, last pushed 3mo ago), licensed MIT. It adds 201 tokens to every session and 2,835 once invoked, about $0.0010 per session on Opus 5. A static security scan graded it A with 0 findings. It is 92% identical to xlsx, differing in 18 lines, and is treated as a copy.
Other skills, from other repositories
Excel工具
Skill "Excel工具" from XiaoMaColtAI/math-modeling-skill, covering excel 工具, 原则, 读取与写入, 第一行就是数据时必须显式使用 header=none。 and 公式重算.
xlsx
Create, edit, analyze, or convert Excel spreadsheets (.xlsx, .xlsm, .xltx) where the workbook file is the primary deliverable. Use for formulas, formatting, financial models, multi-sheet workbooks, and tabular cleanup exported to Excel. Also applies to .csv/.tsv when the user wants spreadsheet output. Do NOT use for…
dgn-to-excel
Convert DGN files (v7-v8) to Excel databases. Extract elements, levels, and properties from infrastructure CAD files.
dwg-to-excel
Convert AutoCAD DWG files (1983-2026) to Excel databases using DwgExporter CLI. Extract layers, blocks, attributes, and geometry data without Autodesk licenses.
ifc-to-excel
Convert IFC files (2x3, 4x1, 4x3) to Excel databases using IfcExporter CLI. Extract BIM data, properties, and geometry without proprietary software.
historical-data-manager
Extract, clean, and organize legacy construction data from archives. Migrate historical project data, cost records, and schedules into modern formats.