walkingzzzy/lvke-mcp

0Stars on the repository
111Mods indexed here, across every type
5d agoLast push, which is what freshness is scored on
noneNo LICENSE: all rights reserved, so bodies are not copied

walkingzzzy/lvke-mcp

Skill Claude CodeCodex

A guide to calculating internal rate of return (IRR), net present value (NPV), and simple and discounted payback periods for investments.

not rated 0 5d ago A 40 tokens

walkingzzzy/lvke-mcp

Skill Codex

Run and inspect Lvke's deterministic finance model from a confirmed FinanceSpec v3 and Basis of Estimate. Use for FinanceRun creation, cash flow, debt service, tax, IRR, NPV, payback, balance, scenario, and consistency results with immutable lineage.

not rated 0 5d ago A 62 tokens

lvke-finance-spec

27

walkingzzzy/lvke-mcp

Skill Codex

Prepare, validate, build a Basis of Estimate for, and confirm an evidence-aware FinanceSpec v3. Use when planning objects must become finance inputs, when finance validation reports missing fields, or when sourcereconstructed inputs need process-acceptance lineage before a FinanceRun.

not rated 0 5d ago A 60 tokens

lvke-finance-tables

28

walkingzzzy/lvke-mcp

Skill Codex

Validate, render, inspect, and export the fixed thirteen feasibility-study finance tables from one immutable FinanceRun. Use when a valid runid must produce a FinanceTablesPackage, thirteen CSV resources, or XLSX with technical and formal lineage checks.

not rated 0 5d ago A 55 tokens

walkingzzzy/lvke-mcp

Skill Claude CodeCodex

A guide to financial analysis using baseline, optimistic, and pessimistic scenarios. Scenarios are alternative sets of assumptions used to test possible outcomes.

not rated 0 5d ago A 35 tokens

walkingzzzy/lvke-mcp

Skill Claude CodeCodex

A guide to one-factor sensitivity analysis and break-even analysis for financial models. Sensitivity analysis tests how changing one input affects results, while break-even analysis finds when income covers costs.

not rated 0 5d ago A 31 tokens

walkingzzzy/lvke-mcp

Skill Claude CodeCodex

A financial-modeling guide for setting tax assumptions such as value-added tax, corporate income tax, local surcharges, stamp duty, land-related taxes, and tax incentives. It describes standard ways to represent these items in a model.

not rated 0 5d ago A 46 tokens

lvke-frontend

32

walkingzzzy/lvke-mcp

Skill Codex

Implement and polish the Lvke React workbench and visual interface. Use for pages, components, API integration, accessibility, responsive layout, or frontend design work.

not rated 0 5d ago A 37 tokens

frontend-design

33

walkingzzzy/lvke-mcp

Skill Claude CodeCodex

SuperDesign-based visual UI guidelines (layout, theme, motion, a11y aesthetics). Use when polishing or designing presentation UI — landing pages, marketing, empty states, visual hierarchy, spacing/typography, or net-new decorative surfaces. Do NOT use alone for Lvke workbench product behavior: for web/ workbench…

not rated 0 5d ago A 119 tokens

walkingzzzy/lvke-mcp

Skill Claude CodeCodex

A frontend development guide for the Lvke web workbench, a React application built with Vite and TypeScript.

not rated 0 5d ago A 110 tokens

lvke-golden-p0b

35

walkingzzzy/lvke-mcp

Skill Claude CodeCodex

A verification and record-keeping workflow for Lvke's golden samples. Golden samples are approved reference results used to check whether later builds still behave correctly.

not rated 0 5d ago A 106 tokens

walkingzzzy/lvke-mcp

Skill Codex

A testing procedure for Lvke MCP services that checks tools through real-time conversations and calls. It covers complete acceptance checks, including tool listings, service restarts, and specific project outputs.

not rated 0 5d ago A 112 tokens

walkingzzzy/lvke-mcp

Skill Claude CodeCodex

An industry reference for feasibility studies of modern agriculture and agricultural-processing projects, including high-standard farmland, facility farming, processing parks, and smart agriculture.

not rated 0 5d ago A 46 tokens

walkingzzzy/lvke-mcp

Skill Claude CodeCodex

An industry reference for feasibility studies of energy projects, including electricity, wind, solar, energy storage, and oil and gas.

not rated 0 5d ago A 47 tokens

walkingzzzy/lvke-mcp

Skill Codex

Apply feasibility methods for retail, commercial complexes, consumer services, business services, and modern-service projects other than hotel acquisition. Use for catchment demand, merchant or service mix, pricing, occupancy, turnover, lease, operating cost, and service-capacity planning.

not rated 0 5d ago A 57 tokens

walkingzzzy/lvke-mcp

Skill Codex

Apply cultural-tourism, children's amusement, theme-park, scenic-area, and cultural-venue feasibility methods. Use for demand, visitor capacity, ticket and secondary-spend revenue, attraction mix, amusement safety, operations, seasonality, and compliance planning.

not rated 0 5d ago A 57 tokens

walkingzzzy/lvke-mcp

Skill Codex

Apply feasibility methods for water, wastewater, solid waste, environmental facilities, heating, gas, and other public utilities. Use for demand and design capacity, inflow or waste composition, tariff and government-payment revenue, process options, environmental compliance, and lifecycle cost.

not rated 0 5d ago A 60 tokens

walkingzzzy/lvke-mcp

Skill Codex

Apply feasibility methods for logistics parks, warehouses, freight hubs, passenger terminals, parking, multimodal transport, and supply-chain facilities. Use for cargo or passenger demand, network catchment, throughput, storage and berth capacity, tariffs, equipment, labor, and transport safety.

not rated 0 5d ago A 61 tokens

walkingzzzy/lvke-mcp

Skill Codex

Apply feasibility methods for education, healthcare, eldercare, sports, community, and other social or public-service projects. Use for service-population need, capacity, accessibility, government-payment or user-fee revenue, staffing, public value, and service-quality constraints.

not rated 0 5d ago A 57 tokens

walkingzzzy/lvke-mcp

Skill Claude CodeCodex

A reference guide for feasibility studies of infrastructure projects such as roads, railways, bridges, water works, municipal pipelines, utility tunnels, and logistics parks. It covers relevant standards and typical investment measures.

not rated 0 5d ago A 47 tokens

lvke-build-scale

45

walkingzzzy/lvke-mcp

Skill Codex

Create deterministic Lvke BuildScaleCase objects constrained by confirmed market demand, target capacity, land, facilities, plot ratio, coverage, and green ratio. Use before project investment, staffing, finance, or construction-scheme drafting.

not rated 0 5d ago A 50 tokens

lvke-cost-drivers

46

walkingzzzy/lvke-mcp

Skill Codex

Create and confirm immutable CostDriverSet objects with closed investment and auditable operating-cost items. Use when a confirmed BuildScaleCase must become investment, raw-material, energy, environmental, maintenance, and other FinanceSpec cost inputs.

not rated 0 5d ago A 51 tokens

walkingzzzy/lvke-mcp

Skill Claude CodeCodex

After projectcontextvalidate, read the InputApplicability object and have Codex collect only the missing required fields. Use for conversation-first project intake without a front end.

not rated 0 5d ago A 41 tokens

walkingzzzy/lvke-mcp

Skill Codex

Resolve the primary project industry route and read versioned planning constraints from ProjectContext. Use before market, option, scale, cost, revenue, finance, or acquisition work when industrycode, assettype, projecttype, or transaction structure determines the applicable business workflow.

not rated 0 5d ago A 58 tokens

At most 3 mods per repository are shown here, and a mod shipped inside a plugin is left to that plugin's page — the rest are on their repository pages: