Autonomous investigation loop for operational and engineering anomalies — turns an agent from 'told what to look for' into 'discovers relationships and hypotheses on its own'. USE WHEN: solving a PEPR action, root-cause, or operational study where the symptom, driver, or important relationships are NOT given up front.…
Structured inventory of NeqSim's capabilities by engineering discipline. USE WHEN: checking what NeqSim can do, planning implementations, assessing gaps for engineering tasks, or routing work to the right agent. Covers thermodynamics, process equipment, PVT, standards, mechanical design, flow assurance, safety, and…
CO2 capture, transport, storage (CCS) and hydrogen systems patterns for NeqSim. USE WHEN: modeling CO2 pipelines, injection wells, impurity effects on phase behavior, CO2 dense phase transport, hydrogen blending, electrolysis, or any CCS/H2 value chain analysis. Covers CO2 phase behavior, impurity management, well…
Set up anti-surge recycle control and coordinated minimum-speed recycle control for centrifugal compressors in NeqSim, including compressor performance chart generation, anti-surge calculation, MinimumSpeedRecycleControllerStructure use for coordinated pressure/speed/recycle split-range control, fuel gas savings, CO2…
Emergency depressurization (blowdown) per API 521 §5.20 and minimum design metal temperature (MDMT) assessment per ASME UCS-66 / API 579 / EN 13445 — VU-flash transient inventory model, time-to-target-pressure, low-temperature embrittlement screening, and integration with PSV/flare loads. USE WHEN: a task requires…
Classify mixed engineering documents and images, route native text/table, OCR, and vision extraction, and produce source-traceable evidence packages with confidence and human-review gates. USE WHEN: a NeqSim task receives PDFs, scans, Word/Excel files, drawings, charts, photographs, or multiple conflicting engineering…
Implement and test NeqSim process-equipment runTransient support. USE WHEN: adding dynamic simulation behavior to any ProcessEquipmentInterface class, including inventory volume, pressure/level/temperature state, controller response, and JUnit regression tests for transient timesteps.
Electrolyte and brine chemistry guidance for NeqSim. USE WHEN: modeling produced water, scale prediction, CO2/H2S in aqueous systems, MEG/DEG injection, hydrate inhibitor dosing, or any system with ions, salts, or electrolytes. Covers SystemElectrolyteCPAstatoil setup, ion components, scale risk assessment, and brine…
Classify mixed engineering documents and images, route native text/table, OCR, and vision extraction, and produce source-traceable evidence packages with confidence and human-review gates. USE WHEN: a NeqSim task receives PDFs, scans, Word/Excel files, drawings, charts, photographs, or multiple conflicting engineering…
Educational combustion-CO2 emission screening that estimates the CO2 mass rate from a fuel-gas flow and composition using public per-component carbon-count stoichiometry and the IPCC basis. USE WHEN: a task needs a public, screening-level CO2 emission rate (kg/s or tonnes/day) from burning a fuel-gas stream before…
Educational field-life energy and CO2-equivalent emissions roll-up that turns a year-by-year energy use into annual and total CO2e, a carbon intensity (kg CO2e/boe), and an optional CO2-tax cost. USE WHEN: a task needs a public, screening-level field-life emissions and carbon-intensity picture before detailed NeqSim…
Educational artificial-lift screening that compares a simple straight-line IPR natural deliverability against a target rate and screens gas lift and ESP feasibility from a required bottomhole-pressure reduction. USE WHEN: a task needs a public, screening-level recommendation of natural flow, gas lift, or ESP for a…
Educational discounted-cash-flow (DCF) asset-value screening that builds a year-by-year net cash flow from revenue, OPEX, and a CAPEX schedule and returns NPV, IRR, and payback with a simple flat tax. USE WHEN: a task needs a public, screening-level NPV/IRR/payback before detailed NeqSim field-development economics or…
Educational factored CAPEX/OPEX screening that turns a bare equipment cost into a total installed CAPEX (Lang/Hand-style installation factor + contingency), an annual OPEX, and a lifecycle total cost of ownership. USE WHEN: a task needs a public, screening-level CAPEX and OPEX magnitude before detailed NeqSim…
Educational design-basis margin screening for flow, pressure, and temperature design margins versus operating conditions, with a standards-basis echo. USE WHEN: a task needs a public, screening-level check that proposed design capacities and conditions carry sensible margins over operating before detailed mechanical…
Educational economy-basis assembly and range-check screening for prices, discount rate, currency, inflation, and tax regime. USE WHEN: a task needs a public, screening-level economic assumptions basis with sanity flags before an asset-value (NPV) screening or detailed NeqSim field-economics modelling.
Educational reservoir tank-depletion vs time screening with gas/oil and water-cut evolution. USE WHEN: a task needs a public, screening-level pressure-decline and production profile over time from a recoverable volume and offtake rate before detailed NeqSim SimpleReservoir or reservoir-engineering modelling.
Set up a screening-level reservoir model from whatever data exists, on a data-maturity ladder from a single public headline volume up to a full static-model parameter set, and refine it as data arrives. USE WHEN: a task needs a reservoir model for a field where only open data is available (for example an NCS field on…
Educational petroleum resource classification screening using public SODIR RC0-RC9 project maturity and SPE-PRMS categories as independent axes. USE WHEN: a task needs to classify historical production, reserves, contingent resources, or undiscovered/prospective resources without confusing maturity with 1P/2P/3P or…