Getting it into your agent
One page per mod, every tool's command on it. A separate URL per tool would split the same page into five that compete with each other.
git clone --depth 1 https://github.com/alexlautw9527/.aiWrote this? Show the measurements
A badge with what this costs and how it scanned, read live from this page, so it follows the numbers instead of freezing them. Markdown for a README, HTML for a documentation site or a project page.
[](https://agentmods.dev/commands/alexlautw9527/.ai/work-breakdown)<a href="https://agentmods.dev/commands/alexlautw9527/.ai/work-breakdown"><img src="https://agentmods.dev/badge/commands/alexlautw9527/.ai/work-breakdown/github.svg" alt="Measured on agentmods" height="20"></a>Or the 80×15 button, for a site that already has a row of RSS and ATOM ones. Only the verdict fits; the numbers stay here.
<a href="https://agentmods.dev/commands/alexlautw9527/.ai/work-breakdown"><img src="https://agentmods.dev/badge/commands/alexlautw9527/.ai/work-breakdown.svg" alt="Reviewed on agentmods" width="80" height="20"></a>What it costs to keep this loaded
Counted locally with the o200k_base tokenizer, which is exact for GPT models; Claude uses its own tokenizer and its counts differ. Treat this as one consistent yardstick across the catalogue rather than a bill. Prices are per million input tokens.
| Model | Per session | Once invoked |
|---|---|---|
| Fable 5.1 | $0.00000 | $0.00425 |
| Opus 5 | $0.00000 | $0.00212 |
| Sonnet 5 | $0.00000 | $0.00085 |
| Haiku 4.5 | $0.00000 | $0.00042 |
Grade A, and why
work-breakdown scanned grade A with 0 findings against 26 rules in 11 categories — prompt injection, anti-refusal, data exfiltration, privilege escalation, supply chain, agent snooping, system-prompt leakage, SSRF and excessive agency — measured 11d ago.
A static scan of the body, not an audit. Every finding is printed with the line that produced it so you can judge whether it matters here. A mod is markdown that instructs an agent; that is exactly why what it instructs is worth reading.
Nothing flagged
None of the 26 patterns this scan looks for appear in this file: no shell pipes, no recursive deletes, no credential paths, no hidden text, no instruction-override or anti-refusal phrasing, no agent-config snooping. That is not a guarantee, it is the absence of the things that are checkable.
The source is not reproduced here
No licence file
A repository with no LICENSE is all rights reserved by default, so the body is not copied here. The metadata, the measurements and the link are.
What this file has done since we first saw it
Hashed on every crawl. A supply-chain change to an agent config is a question of when, not whether, so the history is kept rather than the latest state alone.
- 11d ago First seen · 33 lines · 0 tokens per session scan A 1bd977238be6
work-breakdown is a command published in the GitHub repository alexlautw9527/.ai (5 stars, last pushed 9mo ago), with no licence file. It costs nothing until one of its globs matches a file; then it loads 425 tokens. A static security scan graded it A with 0 findings. No closer match exists in the catalogue, so it is treated as the original; first seen 2026-08-31.
Other commands, from other repositories
template
Manage issue templates for streamlined issue creation.
sync-linear
Sync current work with Linear ticket status.
add-note
Add an internal or external note to a ConnectWise PSA ticket.
fest-show
Show festival progression (in-progress tasks, roadmap, and dependency view).
dispatcher
Pick the next-best repo to work on across the portfolio — rank free repos, recommend one, claim its lease atomically, and route to the entry command.
workpm
A project-management workflow for coordinating multiple AI workers through five stages. It includes task assignment, shared activity logs, worker replacement, and final checks.