mlobo2012/US-Construction-Superintendent-Plugin
Command
Generate a 3-week lookahead schedule template with trade/activity rows, daily breakdown, milestone callouts, inspection dates, and dependency flags.
US Construction Superintendent Plugin for Claude Code & Cowork — 10 slash commands, 12 skills, OSHA 29 CFR 1926, CSI MasterFormat, AIA A201, Davis-Bacon. Built by AI Heroes.
mlobo2012/US-Construction-Superintendent-Plugin
Command
Generate a 3-week lookahead schedule template with trade/activity rows, daily breakdown, milestone callouts, inspection dates, and dependency flags.
mlobo2012/US-Construction-Superintendent-Plugin
Command
Draft a backcharge notification to a subcontractor citing contract provision, describing deficient work, corrective action taken, cost being charged, and deadline for response.
mlobo2012/US-Construction-Superintendent-Plugin
Command
Generate a construction daily report pre-filled with date, weather, workforce count by trade, work performed, deliveries, inspections, delays, and safety observations.
mlobo2012/US-Construction-Superintendent-Plugin
Command
Generate a formal Notice of Delay letter citing contract clause, describing the delay event, identifying responsible party, and requesting a time extension.
mlobo2012/US-Construction-Superintendent-Plugin
Command
Draft a properly formatted Request for Information (RFI) with sequential numbering, drawing/spec references, proposed resolution, and required response date.
mlobo2012/US-Construction-Superintendent-Plugin
Command
Look up OSHA requirements for a specific hazard or activity with the exact CFR reference, plain-language explanation, and competent person obligations.
mlobo2012/US-Construction-Superintendent-Plugin
Command
Create a structured punch list organized by area/room with item description, responsible sub, priority, photo reference, due date, and status.
mlobo2012/US-Construction-Superintendent-Plugin
Command
Search and summarize specification requirements for a CSI division, section number, or product type. Returns Part 1 (General), Part 2 (Products), Part 3 (Execution) in plain language.
mlobo2012/US-Construction-Superintendent-Plugin
Command
Draft a formal subcontractor letter (schedule acceleration, cure notice, manpower request, quality deficiency) with contract references and professional tone.
mlobo2012/US-Construction-Superintendent-Plugin
Command
Generate a 5-minute toolbox talk script on a specified OSHA topic with discussion questions and sign-in sheet format.