resource-leveler

resource-leveler is a skill for Claude Code, Codex from datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction. It costs 29 tokens per session (3,331 once invoked), scanned A, original, MIT.

A scheduling tool that balances labor and equipment assignments across a construction plan. Resource leveling means reducing periods where more people or equipment are assigned than are available.

In plain words
What is it for?
Use it to adjust resource assignments, balance workload, control equipment use, and keep important schedule dates achievable.
Why use it?
It helps avoid overallocated crews, idle time, overtime, equipment waste, and schedules that cannot realistically be completed.

Skill for Claude CodeCodex

Which agent this was written for is unclear — built for openclaw. Also seen: built for openclaw.

Good fit Use it to adjust resource assignments, balance workload, control equipment use, and keep important schedule dates achievable.

Compare 6 skills from other repositories ↓
Install with agentmods
npx agentmods add skills/datadrivenconstruction/ddc_skills_for_ai_agents_in_construction/resource-leveler
Install

Getting it into your agent

One page per mod, every tool's command on it. A separate URL per tool would split the same page into five that compete with each other.

Any agent
npx skills add datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction --skill resource-leveler
Clone the repo
git clone --depth 1 https://github.com/datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction

Made for: Claude Code, Codex.

Wrote this? Show the measurements

A badge with what this costs and how it scanned, read live from this page, so it follows the numbers instead of freezing them. Markdown for a README, HTML for a documentation site or a project page.

agentmods badge for resource-leveler

README.md
[![agentmods](https://agentmods.dev/badge/skills/datadrivenconstruction/ddc_skills_for_ai_agents_in_construction/resource-leveler/github.svg)](https://agentmods.dev/skills/datadrivenconstruction/ddc_skills_for_ai_agents_in_construction/resource-leveler)
Your own site
<a href="https://agentmods.dev/skills/datadrivenconstruction/ddc_skills_for_ai_agents_in_construction/resource-leveler"><img src="https://agentmods.dev/badge/skills/datadrivenconstruction/ddc_skills_for_ai_agents_in_construction/resource-leveler/github.svg" alt="Measured on agentmods" height="20"></a>

Or the 80×15 button, for a site that already has a row of RSS and ATOM ones. Only the verdict fits; the numbers stay here.

agentmods 80×15 button for resource-leveler

Your own site · 80×15
<a href="https://agentmods.dev/skills/datadrivenconstruction/ddc_skills_for_ai_agents_in_construction/resource-leveler"><img src="https://agentmods.dev/badge/skills/datadrivenconstruction/ddc_skills_for_ai_agents_in_construction/resource-leveler.svg" alt="Reviewed on agentmods" width="80" height="20"></a>
Per session 29 Skills are progressive disclosure: only the name and description are preloaded; the body loads when the skill is used.
When invoked 3,331 The whole file, excluding the scripts and references it only reads on demand.
Security scan A 0 findings. A grade says what 26 rules found in the file — not that it is safe. Third-party audits
  • NVIDIA SkillSpector warn 7 Sept 2026
SkillSpector: 1 finding, up to medium

These are SkillSpector’s own severities. On a checked sample its high-severity flags on skills were ~96% false positives — a documented command, a public API, a “never do X” rule — so we show them as a caution to read, not a verdict. Why →

  • medium Rogue Agent · line 82
    Skill establishes unauthorized persistence across sessions via cron jobs, startup scripts, or state files. Session persistence allows an attacker to maintain access beyond the current interaction.
    Fix: Remove any persistence mechanisms (cron jobs, startup scripts, state files). Skills should not maintain state across sessions without explicit user consent.
How audits are shown
Origin original No closer match found in the catalogue.
Token cost

What it costs to keep this loaded

Counted locally with the o200k_base tokenizer, which is exact for GPT models; Claude uses its own tokenizer and its counts differ. Treat this as one consistent yardstick across the catalogue rather than a bill. Prices are per million input tokens.

ModelPer sessionOnce invoked
Fable 5.1 $0.00029 $0.03331
Opus 5.5 $0.00012 $0.01332
Sonnet 5.5 $0.00006 $0.00666
Haiku 4.5 $0.00003 $0.00333

Measured 1mo ago against content hash 7789fb8bd9ab, method: parsed. Prices are Anthropic first-party input rates as of 2026-10-07, from the pricing page.

Security

Grade A, and why

resource-leveler scanned grade A with 0 findings against 26 rules in 11 categories — prompt injection, anti-refusal, data exfiltration, privilege escalation, supply chain, agent snooping, system-prompt leakage, SSRF and excessive agency — measured 1mo ago.

A static scan of the body, not an audit. Every finding is printed with the line that produced it so you can judge whether it matters here. A mod is markdown that instructs an agent; that is exactly why what it instructs is worth reading.

Nothing flagged

None of the 26 patterns this scan looks for appear in this file: no shell pipes, no recursive deletes, no credential paths, no hidden text, no instruction-override or anti-refusal phrasing, no agent-config snooping. That is not a guarantee, it is the absence of the things that are checkable.

Origin

Copies of this mod

1 near-identical copy found in the catalogue:

2_DDC_Book/3.3-4D-BIM-CO2-Simulation/resource-leveler/SKILL.md · 465 lines

How it starts

The opening of the file, as written. The whole thing — 465 lines — stays where its author put it; the contents beside it link to each section on GitHub.

Resource Leveler for Construction

Overview

Optimize resource allocation across construction schedules. Level labor and equipment to avoid peaks, balance workload, and maintain project deadlines while reducing costs.

Business Case

Resource leveling provides:

  • Cost Reduction: Avoid overtime and idle time
  • Workforce Stability: Consistent crew sizes
  • Equipment Optimization: Reduce rental costs
  • Realistic Schedules: Achievable resource plans

Technical Implementation

from dataclasses import dataclass, field
from typing import List, Dict, Any, Optional, Tuple
from datetime import datetime, date, timedelta
import pandas as pd
import numpy as np
from collections import defaultdict

@dataclass
class Resource:
    id: str
    name: str
    resource_type: str  # labor, equipment, material
    max_units: float
    cost_per_unit: float
    unit: str  # hours, days, each

@dataclass
class ResourceAssignment:
    task_id: str
    resource_id: str
    units: float
    start_date: date
    end_date: date

@dataclass
class Task:
    id: str
    name: str
    duration: int  # days
    start_date: date
    end_date: date
    predecessors: List[str]
    total_float: int
    is_critical: bool
    resource_assignments: List[ResourceAssignment] = field(default_factory=list)

@dataclass
class LevelingResult:
    success: bool
    original_end_date: date
    leveled_end_date: date
    tasks_moved: int
    peak_reduction: Dict[str, float]
    warnings: List[str]

class ConstructionResourceLeveler:
    """Level resources across construction schedules."""

    def __init__(self):
        self.resources: Dict[str, Resource] = {}
        self.tasks: Dict[str, Task] = {}
        self.assignments: List[ResourceAssignment] = []

    def add_resource(self, resource: Resource):
        """Add a resource to the pool."""
        self.resources[resource.id] = resource

    def add_task(self, task: Task):
        """Add a task to the schedule."""
        self.tasks[task.id] = task

    def add_assignment(self, assignment: ResourceAssignment):
        """Assign a resource to a task."""
        self.assignments.append(assignment)
        if assignment.task_id in self.tasks:
            self.tasks[assignment.task_id].resource_assignments.append(assignment)

    def calculate_resource_usage(self, start_date: date = None,
                                  end_date: date = None) -> pd.DataFrame:
        """Calculate daily resource usage."""
        if not self.assignments:
            return pd.DataFrame()

        # Determine date range
        if start_date is None:
            start_date = min(a.start_date for a in self.assignments)
        if end_date is None:
            end_date = max(a.end_date for a in self.assignments)

        # Create date range
        dates = pd.date_range(start_date, end_date, freq='D')

        # Initialize usage matrix
        usage = {r_id: [0.0] * len(dates) for r_id in self.resources}

        # Fill in usage
        for assignment in self.assignments:
            if assignment.resource_id in usage:
                for i, d in enumerate(dates):
                    if assignment.start_date <= d.date() <= assignment.end_date:
                        usage[assignment.resource_id][i] += assignment.units

        df = pd.DataFrame(usage, index=dates)
        df.index.name = 'date'

        return df

    def identify_overallocations(self) -> List[Dict]:
        """Identify resource overallocations."""
        usage = self.calculate_resource_usage()
        overallocations = []

        for resource_id, resource in self.resources.items():
            if resource_id in usage.columns:
                daily_usage = usage[resource_id]
                over_days = daily_usage[daily_usage > resource.max_units]

                if len(over_days) > 0:
                    overallocations.append({
                        'resource_id': resource_id,
                        'resource_name': resource.name,
                        'max_units': resource.max_units,
                        'peak_usage': daily_usage.max(),
                        'over_by': daily_usage.max() - resource.max_units,
                        'days_overallocated': len(over_days),
                        'first_overallocation': over_days.index[0].date(),
                        'worst_day': daily_usage.idxmax().date()
                    })

        return overallocations

    def level_resources(self, method: str = 'float_priority',
                        protect_critical_path: bool = True,
                        max_extension: int = 30) -> LevelingResult:
        """Level resources to resolve overallocations."""

        original_end = max(t.end_date for t in self.tasks.values())
        tasks_moved = 0
        warnings = []

        # Get initial overallocations
        initial_over = self.identify_overallocations()
        if not initial_over:
            return LevelingResult(
                success=True,
                original_end_date=original_end,
                leveled_end_date=original_end,
                tasks_moved=0,
                peak_reduction={},
                warnings=["No overallocations found"]
            )

        # Track peak usage before
        usage_before = self.calculate_resource_usage()
        peaks_before = {r: usage_before[r].max() for r in usage_before.columns}

        # Leveling loop
        iteration = 0
        max_iterations = len(self.tasks) * 2

        while iteration < max_iterations:
            iteration += 1
            overallocations = self.identify_overallocations()

            if not overallocations:
                break

            # Find task to move
            moved = False
            for over in overallocations:
                resource_id = over['resource_id']
                worst_day = over['worst_day']

                # Find tasks using this resource on worst day
                candidates = self._find_movable_tasks(
                    resource_id, worst_day, protect_critical_path
                )

                if candidates:
                    # Sort by priority (lowest float first to preserve options)
                    candidates.sort(key=lambda t: -t.total_float)
                    task_to_move = candidates[0]

                    # Calculate new dates
                    new_start, new_end = self._calculate_shift(
                        task_to_move, resource_id, max_extension
                    )

                    if new_start:
                        self._shift_task(task_to_move.id, new_start, new_end)
                        tasks_moved += 1
                        moved = True
                        break

            if not moved:
                warnings.append("Could not resolve all overallocations")
                break

        # Calculate results
        usage_after = self.calculate_resource_usage()
        peaks_after = {r: usage_after[r].max() for r in usage_after.columns}

        peak_reduction = {}
        for r in peaks_before:
            if r in peaks_after:
                reduction = (peaks_before[r] - peaks_after[r]) / peaks_before[r] * 100
                peak_reduction[r] = reduction

        leveled_end = max(t.end_date for t in self.tasks.values())

        if leveled_end > original_end + timedelta(days=max_extension):
            warnings.append(f"Project extended beyond max allowed ({max_extension} days)")

        remaining_over = self.identify_overallocations()

        return LevelingResult(
            success=len(remaining_over) == 0,
            original_end_date=original_end,
            leveled_end_date=leveled_end,
            tasks_moved=tasks_moved,
            peak_reduction=peak_reduction,
            warnings=warnings
        )

    def _find_movable_tasks(self, resource_id: str, on_date: date,
                            protect_critical: bool) -> List[Task]:
        """Find tasks that can be moved to reduce overallocation."""
        candidates = []

        for task in self.tasks.values():
            # Check if task uses this resource on this date
            uses_resource = any(
                a.resource_id == resource_id and
                a.start_date <= on_date <= a.end_date
                for a in task.resource_assignments
            )

            if not uses_resource:
                continue

            # Check if critical path protected
            if protect_critical and task.is_critical:
                continue

            # Check if has float
            if task.total_float > 0:
                candidates.append(task)

        return candidates

    def _calculate_shift(self, task: Task, resource_id: str,
                         max_extension: int) -> Tuple[date, date]:
        """Calculate optimal shift for a task."""
        resource = self.resources[resource_id]

        # Try shifting forward
        for days in range(1, min(task.total_float + 1, max_extension + 1)):
            new_start = task.start_date + timedelta(days=days)
            new_end = task.end_date + timedelta(days=days)

            # Check if this resolves overallocation
            temp_usage = self._calculate_usage_if_moved(task.id, new_start, new_end)

            if temp_usage.get(resource_id, 0) <= resource.max_units:
                return new_start, new_end

        return None, None

    def _calculate_usage_if_moved(self, task_id: str, new_start: date,
                                   new_end: date) -> Dict[str, float]:
        """Calculate resource usage if task were moved."""
        # Simplified: calculate peak on affected dates
        usage = defaultdict(float)

        for assignment in self.assignments:
            if assignment.task_id == task_id:
                # Use new dates
                for d in pd.date_range(new_start, new_end):
                    usage[assignment.resource_id] = max(
                        usage[assignment.resource_id],
                        assignment.units
                    )
            else:
                # Use existing dates
                for d in pd.date_range(assignment.start_date, assignment.end_date):
                    usage[assignment.resource_id] = max(
                        usage[assignment.resource_id],
                        assignment.units
                    )

        return dict(usage)

    def _shift_task(self, task_id: str, new_start: date, new_end: date):
        """Shift a task to new dates."""
        task = self.tasks[task_id]
        delta = new_start - task.start_date

        # Update task
        task.start_date = new_start
        task.end_date = new_end

        # Update assignments
        for assignment in self.assignments:
            if assignment.task_id == task_id:
                assignment.start_date += delta
                assignment.end_date += delta

    def optimize_crew_size(self, resource_id: str,
                            target_utilization: float = 0.85) -> Dict:
        """Recommend optimal crew size for a resource."""
        usage = self.calculate_resource_usage()

        if resource_id not in usage.columns:
            return None

        daily_usage = usage[resource_id]
        resource = self.resources[resource_id]

        # Calculate statistics
        peak = daily_usage.max()
        avg = daily_usage.mean()
        working_days = (daily_usage > 0).sum()

        # Current utilization
        current_util = avg / resource.max_units if resource.max_units > 0 else 0

        # Optimal size for target utilization
        optimal_size = avg / target_utilization

        return {
            'resource_id': resource_id,
            'current_max_units': resource.max_units,
            'peak_usage': peak,
            'average_usage': avg,
            'working_days': int(working_days),
            'current_utilization': current_util,
            'recommended_max_units': round(optimal_size, 1),
            'potential_savings': (resource.max_units - optimal_size) * resource.cost_per_unit * working_days
        }

    def generate_histogram(self, resource_id: str) -> pd.DataFrame:
        """Generate resource histogram data."""
        usage = self.calculate_resource_usage()

        if resource_id not in usage.columns:
            return pd.DataFrame()

        resource = self.resources[resource_id]

        df = pd.DataFrame({
            'date': usage.index,
            'usage': usage[resource_id].values,
            'capacity': resource.max_units,
            'overallocated': usage[resource_id].values > resource.max_units
        })

        return df

    def generate_report(self) -> str:
        """Generate resource leveling report."""
        lines = ["# Resource Leveling Report", ""]
        lines.append(f"**Generated:** {datetime.now().strftime('%Y-%m-%d %H:%M')}")
        lines.append(f"**Resources:** {len(self.resources)}")
        lines.append(f"**Tasks:** {len(self.tasks)}")
        lines.append("")

        # Overallocations
        overallocations = self.identify_overallocations()
        if overallocations:
            lines.append("## Overallocations Found")
            for over in overallocations:
                lines.append(f"\n### {over['resource_name']}")
                lines.append(f"- **Max Units:** {over['max_units']}")
                lines.append(f"- **Peak Usage:** {over['peak_usage']}")
                lines.append(f"- **Days Overallocated:** {over['days_overallocated']}")
                lines.append(f"- **Worst Day:** {over['worst_day']}")
        else:
            lines.append("## No Overallocations")
            lines.append("All resources are within capacity.")

        # Resource utilization
        lines.append("\n## Resource Utilization")
        for resource_id in self.resources:
            opt = self.optimize_crew_size(resource_id)
            if opt:
                lines.append(f"\n### {self.resources[resource_id].name}")
                lines.append(f"- **Utilization:** {opt['current_utilization']:.1%}")
                lines.append(f"- **Peak:** {opt['peak_usage']:.1f}")
                lines.append(f"- **Average:** {opt['average_usage']:.1f}")

        return "\n".join(lines)

Read the full file on GitHub · 465 lines

Files

What ships with it

2 files beside SKILL.md in the same directory: the scripts, references and assets a skill reads on demand. Not counted in the per-session cost; read them before you install if any of them is executable.

Changes

What this file has done since we first saw it

Hashed on every crawl. A supply-chain change to an agent config is a question of when, not whether, so the history is kept rather than the latest state alone.

  1. 1mo ago First seen · 465 lines · 29 tokens per session scan A 7789fb8bd9ab

Subscribe to this mod's changes

resource-leveler is a skill published in the GitHub repository datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction (374 stars, last pushed 8d ago), licensed MIT. It adds 29 tokens to every session and 3,331 once invoked, about $0.0001 per session on Opus 5.5. A static security scan graded it A with 0 findings. No closer match exists in the catalogue, so it is treated as the original; first seen 2026-09-03.

Related

Other skills, from other repositories

process-mapper

Use when a BizOps lead, COO, or process-improvement owner needs to document an end-to-end business process (procurement, employee onboarding, incident handoff, customer-onboarding, claims adjudication) in BPMN-style notation, measure cycle times by stage, surface where work spends most of its time waiting vs. being…

alirezarezvani/claude-skills · 176 tokens

design-handoff-brief

Transform feature briefs into structured design briefs that give designers the context they need before opening Figma. Use when asked to write a design brief, create a design handoff, brief a designer on a new feature, or translate a PRD into design requirements. Produces a brief with user goal, emotional context…

mohitagw15856/pm-claude-skills · 83 tokens

estimating-and-contingency

Produces a cost or effort estimate someone can defend — decomposing the work, choosing between analogous, parametric and bottom-up methods, documenting the basis and its assumptions, expressing confidence as a range, and sizing contingency and management reserve separately. Use this to build an estimate, challenge one…

cbrock84/headcount · 87 tokens

scenario-team-admin

Use when administering a Scenario team from an agent through MCP: restricting which models a team or project can run (model access control, allowlist, blocklist), inviting or removing team and project members, changing roles, capping a member's Creative Unit spend, creating or deleting projects, auditing API keys and…

scenario-labs/skills · 101 tokens

rice-impact-matrix

Califica iniciativas usando tanto RICE como alineación estratégica para una priorización matizada. Úsalo cuando te pidan priorizar características, construir una matriz de prioridades, combinar puntuación cuantitativa con ajuste estratégico, o decidir qué construir después con múltiples iniciativas en competencia.…

mohitagw15856/pm-claude-skills · 93 tokens

multi-agent-client-onboarding

Uses Agent SDK to deploy 3 parallel agents for client onboarding -- workflow auditor, tech stack mapper, and strategy drafter. Real consulting workflow that produces a complete client assessment.

OneWave-AI/claude-skills · 41 tokens