cost-overrun-predictor

cost-overrun-predictor is a skill for Claude Code, Codex from tinh2/skills-hub-registry. It costs 45 tokens per session (2,138 once invoked), scanned A, original, no licence file.

A review of construction project-management software for predicting and controlling budget overruns. It checks whether costs, schedules, changes, and project risks are connected correctly.

In plain words
What is it for?
Use it to check earned value calculations, cost and schedule trends, risk simulations, work-breakdown cost codes, and change-order workflows.
Why use it?
It helps find errors that can hide rising costs or delay warnings until a construction project is already over budget.

Skill for Claude CodeCodex

Which agent this was written for is unclear — body not stored (licence); the path alone says nothing.

Good fit Use it to check earned value calculations, cost and schedule trends, risk simulations, work-breakdown cost codes, and change-order workflows.

Compare 6 skills from other repositories ↓
Install with agentmods
npx agentmods add skills/tinh2/skills-hub-registry/cost-overrun-predictor
Install

Getting it into your agent

One page per mod, every tool's command on it. A separate URL per tool would split the same page into five that compete with each other.

Any agent
npx skills add tinh2/skills-hub-registry --skill cost-overrun-predictor
Clone the repo
git clone --depth 1 https://github.com/tinh2/skills-hub-registry

Made for: Claude Code, Codex.

Wrote this? Show the measurements

A badge with what this costs and how it scanned, read live from this page, so it follows the numbers instead of freezing them. Markdown for a README, HTML for a documentation site or a project page.

agentmods badge for cost-overrun-predictor

README.md
[![agentmods](https://agentmods.dev/badge/skills/tinh2/skills-hub-registry/cost-overrun-predictor/github.svg)](https://agentmods.dev/skills/tinh2/skills-hub-registry/cost-overrun-predictor)
Your own site
<a href="https://agentmods.dev/skills/tinh2/skills-hub-registry/cost-overrun-predictor"><img src="https://agentmods.dev/badge/skills/tinh2/skills-hub-registry/cost-overrun-predictor/github.svg" alt="Measured on agentmods" height="20"></a>

Or the 80×15 button, for a site that already has a row of RSS and ATOM ones. Only the verdict fits; the numbers stay here.

agentmods 80×15 button for cost-overrun-predictor

Your own site · 80×15
<a href="https://agentmods.dev/skills/tinh2/skills-hub-registry/cost-overrun-predictor"><img src="https://agentmods.dev/badge/skills/tinh2/skills-hub-registry/cost-overrun-predictor.svg" alt="Reviewed on agentmods" width="80" height="20"></a>
Per session 45 Skills are progressive disclosure: only the name and description are preloaded; the body loads when the skill is used.
When invoked 2,138 The whole file, excluding the scripts and references it only reads on demand.
Security scan A 0 findings. A grade says what 26 rules found in the file — not that it is safe.
Origin unknown No closer match found in the catalogue.
Token cost

What it costs to keep this loaded

Counted locally with the o200k_base tokenizer, which is exact for GPT models; Claude uses its own tokenizer and its counts differ. Treat this as one consistent yardstick across the catalogue rather than a bill. Prices are per million input tokens.

ModelPer sessionOnce invoked
Fable 5.1 $0.00045 $0.02138
Opus 5.5 $0.00018 $0.00855
Sonnet 5.5 $0.00009 $0.00428
Haiku 4.5 $0.00005 $0.00214

Measured 1mo ago against content hash 08b705aa8563, method: parsed. Prices are Anthropic first-party input rates as of 2026-10-07, from the pricing page.

Security

Grade A, and why

cost-overrun-predictor scanned grade A with 0 findings against 26 rules in 11 categories — prompt injection, anti-refusal, data exfiltration, privilege escalation, supply chain, agent snooping, system-prompt leakage, SSRF and excessive agency — measured 1mo ago.

A static scan of the body, not an audit. Every finding is printed with the line that produced it so you can judge whether it matters here. A mod is markdown that instructs an agent; that is exactly why what it instructs is worth reading.

Nothing flagged

None of the 26 patterns this scan looks for appear in this file: no shell pipes, no recursive deletes, no credential paths, no hidden text, no instruction-override or anti-refusal phrasing, no agent-config snooping. That is not a guarantee, it is the absence of the things that are checkable.

analysis/cost-overrun-predictor/SKILL.md · 201 lines

The source is not reproduced here

No licence file

A repository with no LICENSE is all rights reserved by default, so the body is not copied here. The metadata, the measurements and the link are.

Read it on GitHub

Changes

What this file has done since we first saw it

Hashed on every crawl. A supply-chain change to an agent config is a question of when, not whether, so the history is kept rather than the latest state alone.

  1. 1mo ago Changed · -58 tokens per session 08b705aa8563
  2. 1mo ago First seen · 201 lines · 103 tokens per session scan A 2a6780533fb1

Subscribe to this mod's changes

cost-overrun-predictor is a skill published in the GitHub repository tinh2/skills-hub-registry (22 stars, last pushed 1mo ago), with no licence file. It adds 45 tokens to every session and 2,138 once invoked, about $0.0002 per session on Opus 5.5. A static security scan graded it A with 0 findings. No closer match exists in the catalogue, so it is treated as the original; first seen 2026-08-30.

Related

Other skills, from other repositories

process-mapper

Use when a BizOps lead, COO, or process-improvement owner needs to document an end-to-end business process (procurement, employee onboarding, incident handoff, customer-onboarding, claims adjudication) in BPMN-style notation, measure cycle times by stage, surface where work spends most of its time waiting vs. being…

alirezarezvani/claude-skills · 176 tokens

strategic-alignment

Cascades strategy from boardroom to individual contributor. Detects and fixes misalignment between company goals and team execution. Covers strategy articulation, cascade mapping, orphan goal detection, silo identification, communication gap analysis, and realignment protocols. Use when teams are pulling in different…

alirezarezvani/claude-skills · 92 tokens

feature-prioritisation

Aplica marcos de priorización (RICE, MoSCoW, Kano, ICE, Opportunity Scoring) para clasificar características e items del backlog. Úsalo cuando se te pida priorizar características, clasificar un backlog, decidir qué construir a continuación, o evaluar compensaciones entre ideas competidoras. Produce una lista de…

mohitagw15856/pm-claude-skills · 103 tokens

design-handoff-brief

Transform feature briefs into structured design briefs that give designers the context they need before opening Figma. Use when asked to write a design brief, create a design handoff, brief a designer on a new feature, or translate a PRD into design requirements. Produces a brief with user goal, emotional context…

mohitagw15856/pm-claude-skills · 83 tokens

stakeholder-communication

Communicate effectively with stakeholders across functions and seniority levels. Use this skill when writing status updates, preparing executive reviews, sharing technical decisions with non-technical audiences, managing up, communicating bad news, or designing the communication cadence for a project. Triggers on…

rampstackco/claude-skills · 103 tokens

estimating-and-contingency

Produces a cost or effort estimate someone can defend — decomposing the work, choosing between analogous, parametric and bottom-up methods, documenting the basis and its assumptions, expressing confidence as a range, and sizing contingency and management reserve separately. Use this to build an estimate, challenge one…

cbrock84/headcount · 87 tokens