next-leap-claude-code: Skill for Claude Code

.claude/skills/risk-register/SKILL.md

risk-register is a skill for Claude Code from qa-aman/next-leap-claude-code. It costs 71 tokens per session (668 once invoked), scanned A, original, no licence file.

A shared list of project and feature risks, including their status, mitigations, and owners. A risk is a possible problem that could affect the work.

In plain words
What is it for?
Use it to create, update, consolidate, and monitor risks and their planned responses.
Why use it?
It keeps risks from being scattered across separate documents and makes them easier to review across projects.

Skill for Claude Code

Written for Claude Code: installed under .claude/.

This is qa-aman/next-leap-claude-code's own configuration. It tells Claude Code how to work on next-leap-claude-code itself, so it is not a mod to install elsewhere. Copy it as a starting point and replace the rules that are about this project. Everything next-leap-claude-code configures →

Reuse

Borrowing it

Nothing to install: this file belongs to qa-aman/next-leap-claude-code. Take a copy, put it at the same path in your own repository, and replace the rules that are about this project with yours.

Copy the file
curl -O https://raw.githubusercontent.com/qa-aman/next-leap-claude-code/main/.claude/skills/risk-register/SKILL.md
Clone the repo
git clone --depth 1 https://github.com/qa-aman/next-leap-claude-code

Made for: Claude Code.

Wrote this? Show the measurements

A badge with what this costs and how it scanned, read live from this page, so it follows the numbers instead of freezing them. Markdown for a README, HTML for a documentation site or a project page.

agentmods badge for risk-register

README.md
[![agentmods](https://agentmods.dev/badge/skills/qa-aman/next-leap-claude-code/risk-register/github.svg)](https://agentmods.dev/skills/qa-aman/next-leap-claude-code/risk-register)
Your own site
<a href="https://agentmods.dev/skills/qa-aman/next-leap-claude-code/risk-register"><img src="https://agentmods.dev/badge/skills/qa-aman/next-leap-claude-code/risk-register/github.svg" alt="Measured on agentmods" height="20"></a>

Or the 80×15 button, for a site that already has a row of RSS and ATOM ones. Only the verdict fits; the numbers stay here.

agentmods 80×15 button for risk-register

Your own site · 80×15
<a href="https://agentmods.dev/skills/qa-aman/next-leap-claude-code/risk-register"><img src="https://agentmods.dev/badge/skills/qa-aman/next-leap-claude-code/risk-register.svg" alt="Reviewed on agentmods" width="80" height="20"></a>
Per session 71 Skills are progressive disclosure: only the name and description are preloaded; the body loads when the skill is used.
When invoked 668 The whole file, excluding the scripts and references it only reads on demand.
Security scan A 0 findings. A grade says what 26 rules found in the file — not that it is safe.
Origin unknown No closer match found in the catalogue.
Token cost

What it costs to keep this loaded

Counted locally with the o200k_base tokenizer, which is exact for GPT models; Claude uses its own tokenizer and its counts differ. Treat this as one consistent yardstick across the catalogue rather than a bill. Prices are per million input tokens.

ModelPer sessionOnce invoked
Fable 5.1 $0.00071 $0.00668
Opus 5.5 $0.00028 $0.00267
Sonnet 5.5 $0.00014 $0.00134
Haiku 4.5 $0.00007 $0.00067

Measured 2mo ago against content hash c1e54560bd85, method: parsed. Prices are Anthropic first-party input rates as of 2026-10-07, from the pricing page.

Security

Grade A, and why

risk-register scanned grade A with 0 findings against 26 rules in 11 categories — prompt injection, anti-refusal, data exfiltration, privilege escalation, supply chain, agent snooping, system-prompt leakage, SSRF and excessive agency — measured 2mo ago.

A static scan of the body, not an audit. Every finding is printed with the line that produced it so you can judge whether it matters here. A mod is markdown that instructs an agent; that is exactly why what it instructs is worth reading.

Nothing flagged

None of the 26 patterns this scan looks for appear in this file: no shell pipes, no recursive deletes, no credential paths, no hidden text, no instruction-override or anti-refusal phrasing, no agent-config snooping. That is not a guarantee, it is the absence of the things that are checkable.

.claude/skills/risk-register/SKILL.md · 79 lines

The source is not reproduced here

No licence file

A repository with no LICENSE is all rights reserved by default, so the body is not copied here. The metadata, the measurements and the link are.

Read it on GitHub

Changes

What this file has done since we first saw it

Hashed on every crawl. A supply-chain change to an agent config is a question of when, not whether, so the history is kept rather than the latest state alone.

  1. 2mo ago First seen · 79 lines · 71 tokens per session scan A c1e54560bd85

Subscribe to this mod's changes

risk-register is a skill published in the GitHub repository qa-aman/next-leap-claude-code (15 stars, last pushed 13d ago), with no licence file. It adds 71 tokens to every session and 668 once invoked, about $0.0003 per session on Opus 5.5. A static security scan graded it A with 0 findings. No closer match exists in the catalogue, so it is treated as the original; first seen 2026-08-30.