How to monitor and fix security issues in Massing — CodeQL alerts, dependency audits, secret scanning, and ReDoS/XXE fixes. Invoke after a push (standing directive) or when doing a hardening pass. Emphasises that a green CodeQL run != zero alerts.
The Massing release discipline — how to ship a verified, CI-green version-numbered release direct to main. Invoke whenever finishing a shippable change (feature, fix, doc). Covers version bump (both files), CHANGELOG/roadmap notes, the ruff/lint CI gotchas, tag, push, and CI/CodeQL verification.
How to verify Massing web/viewer UI changes LIVE — full verification works; two historic "stalls" are fixed and neither was the geometry loader. Invoke when you changed apps/web and need to prove it works. Covers typecheck/lint/vitest/build, driving the real app, and honest flagging of flows you genuinely couldn't…
Use when doing construction site layout planning with the FeiYang LightCAD platform — fence, lawn, foundation pit, road, prefab house 2D/3D modeling. FYLayout: construction site layout secondary development plugin for LightCAD/LightBIM.
Check a UK construction project against CDM 2015 duty-holder requirements and determine F10 notifiability. Use when the user asks about "CDM 2015", "CDM check", "F10", "notifiable project", "duty holders", or is scoping a new project and needs the CDM picture. Outputs duty-holder roles, F10 y/n with reasoning…
Walk a UK contractor through Construction Industry Scheme (CIS) subcontractor verification and calculate the correct deduction. Use when the user asks about "CIS", "CIS verification", "subcontractor deduction", "CIS rate", or is paying a subbie and needs to work out tax. Covers HMRC verification steps, 0/20/30% rate…
Generate a 5-minute UK construction toolbox talk from a one-line risk topic. Use when the user asks for a "toolbox talk", "safety briefing", "tbt", "weekly safety talk", or needs a short briefing to deliver to site operatives. Plain English, real site examples, one question to throw to the team, one specific "do this…
Guía para manejar bien el MCP de Presto (presupuestos y mediciones de RIB, v2025). Úsala SIEMPRE que el trabajo implique Presto, ficheros BC3/FIEBDC o cualquier tool presto — leer/editar conceptos, precios, mediciones, certificaciones, exportar o auditar presupuestos. Explica las DOS vías (COM en vivo, que exige…